Inspection Status: Closed
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2002 |
INITIAL CODE VIOLATION |
|
Closed |
NORMAL CONSTRUCTION GOING ON AT TIME OF VISIT. NOTHING LOOKED OUT OF THE ORDINARY. HOLES WERE BEING FILLED WHERE PIPE REPAIRS WERE MADE. |