Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2002 | INITIAL CODE VIOLATION | Correction Required | INITIAL: NO HEATER FOR 6 WEEKS. HAS BEEN USING ONE SPACE HEATER. HEATER WAS CONDEMNED BY SWG. F/U 1/28/02. |