Permit: T02PL01965

Parcel: 134243110


Addresses:

1002 S DUKE DR

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESS TEST FNL

Date Description Inspector Results Comments
12/10/2002 PLUMBING - GAS PRESS TEST FNL Approved
12/06/2002 PLUMBING - GAS PRESS TEST FNL Denied 1) PRESSURE RELIEF DRAIN PIPE CANNOT BE FLEX COPPER-MUST BE SOLID COPPER PIPING
11/27/2002 PLUMBING - GAS PRESS TEST FNL Denied RELOCATE METER TO OUTSIDE WALL SCOTCHCOAT PIPING OK PRESSURE TEST OK OK TO COVER.
2.) NEED TO SEE FINAL CONNECTION BETWEEN NEW GAS AND EXISTING GS LINES.
3.) REMOVE FEE AND VALVE AT WATER HEATER INLET.
4.) CONNECT T & P RELIEF DRAIN.