Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2002 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*1.) TEN ROUND PRESSURE TEST OK 2.) 2 1/2" & 1 1/2" GAS PIPING OK 3.) 1 1/2" GAS STUBBED OUT FOR BOILER OK 4.) AFTER FINAL CONNECTIONS TO BOILER ARE MADE, AND BEFORE CALLING IN BOILER INSPECTION PLEASE CALL 791-5550. AND ASK FOR THE PLUMBING INSPECTOR TO LEAVE UTILITY CLEARANCE CARD. |
| 10/14/2002 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 10/11/2002 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*PLEASE HAVE PLUMBING READ OVER 1211.3 1211.5. TEST OK AT THIS TIME. WILL REQUIRE A TEST ON COMPLETE SYSTEM WHEN FIXTURE OUR INSTALLED. |