Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/27/2002 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*ALL CORRECTIONS MADE OK 2.) OK FOR GAS 3.) UCC LEFT AT METER. 4.) SW GAS 889-1888. |
| 09/26/2002 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1.) INSTALL APPROVED VALVES AT WATER HEATER AND DRYER MAKE FINAL CONNECTIONS MAY NOT USE MULTIPLE FLEXES CONNECTED TOGETHER. MAX LENGTH FOR DRYER IS SIX FEET. 2.) PRESSURE TEST OK OK TO BACKFILL. |
| 09/25/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) WATER HEATER AND DRYER REQUIRE INDIVIDUAL SHUT OFF. FLEX CONNECTOR FOR DRYER MAXIMUM 6' IN LENGTH. 2.) T & P DRAIN TO BE RUN TO THE OUTSIDE WITH 90 TURNDOWN. PLEASE MAKE SURE THAT T & P VALVE IS OPERABLE. 3.) MAKE SURE VALVES ARE AGA OR CSA APPROVED. |
| 09/20/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) PLEASE PROVIDE INSPECTION HISTORY FOR NEW SCOTCHCOAT UNDERGROUND TO BLDG. 2.) NO T & P RELIEF DRAIN MAKE SURE THAT T & P VALVE IS OPERABLE WHEN PIPING DRAIN. 3.) FLEX CONNECTOR TO DRYER EXCEEDS ALLOWABLE LENGTH 4.) PROVIDE SEPARATE SHUT OFF FOR DRYER. 5.) SECURE APPLIANCE COLLAR AT WATER HEATER 6.) ALUMINUM FOIL IS NOT THE SAME AS METAL BACKED TAPE. |