Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
1.) PE GAS PIPING MUST HAVE A MIN. OF 18" OF COVER SEE SECTION 315.1 94 UPC INSTALLATION STANDARDS. 2.) CAN NOT USE THREAD PRTECTOR COUPLING IN GAS LINE MUST USE APPROVED COUPLING. 3.) MUST REMOVE 3/4" X 1/2" X 3/4 TEE WITH PLUG. 4.) MUST PROVIDE APPROVED GAS SHUT OFF VALVES FOR FURANCE & WATER HTR WITH AGA OR CSA VAVLES. 5.) MUST LOCATE GAS SHUT OFF VALVE BEFORE THE UNION @ HOUSE CONNECTION. 6.) RE TEST SYSTEM 10LBS MIN. @ TIEM OF INSPECTION. 7.) MUST REMOVE UNION @ METER. |