Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/23/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
|
| 05/22/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) ALL PIPING 6" AFG AND BELOW TO BE SCOTHCOAT 2.) ALL FITTINGS AND MARRD PIPE BELOW GRADE TO BE PRIMED AND TAPED. 3.) DO NOT CHANGE PIPE SIZE BEFORE FIRST BRANCH. RUN 3/4" PIPE ALL THE WAY TO THE FIRST TEE. 4.) ROOF PENETRATIONS REQUIRE FLASHINGS. 5.) USE A SWING JOINT ON THE ROOF, AND SUPPORT THE PIPING 1 1/2" ABOVE ROOF. 6.) NO COMBUSTION RELIEF FOR WATER HEART, AND WATER HEATER ROOM OPENS INTO A BEDROOM. 7.) SUPPORT GAS DROPS. |