Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/10/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
|
| 05/06/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) FURANCE FLU VENT MUST HAVE (3) SHEET METAL SCREWS PER JOINT. 2.) WATER HTR 1/2" GAS DROP MUST BE SECURED. 3.) WATER HTR THAT IS LOCATED @ EXTERIOR OF DWELLING IS LEAKING. FLU VENT MUST BE SCREWED DOWN @ VENT CONNECTOR AND JOINTS 4.) MUST RUN HARD PIPE INTO WATER HTR ENCLOSURE THEN CONNECT FLEX CONNECTOR. 5.) CHECK P & T VALVE FOR EXTERIOR WATER HTR FOR PROBE LENGTH. 6.) WATER THAT IS LOCATED INSIDE DWELLING REQUIRES P & T VALVE & DRAIN TO DAYLIGHT. 7.) WATER HTR MUST HAVE 2 10 X 10 LOUVER GRILLS FOR COMBUSTION RELIFE. 8.) INDOOR WATER HTR REQUIRES DBL WALL FLU VENT THRU ROOF W/CAP. 9.) MUST TRIM & CLEAR OUT TREE @ WATER HTR EXTERIOR THIS IS A FIRE HAZZARD 10.) MUST PROVIDE DBL WALL FLU VENT FOR FLOOR HTR @ REAL UNIT MIN 4" 11.) OK TO BACKFILL TRENCH. GAS PRESSURE TEST IS OK. |