Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T02PL00534

Parcel: 134091680

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
03/14/2002 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection 0000*
03/08/2002 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection 0999*1.) MUST USE REQUIRED TEST GAUGE FOR SYSTEM THAT REQUIRE 10LBS. OR LESS OF PRESSURE. SEC SECTION: 712.4.1 94 UPC 2.) MUST REMOVE UNION IN LINE AND REPLACE WITH RIGHT & LEFT HAND NIPPLE SEC SECTION: 1211.10 94 UPC. 2.) WATER HTR REQUIRES A P & T VALVES AND DRAIN TO DAYLIGHT SEC SECTION: 608.3. 608.5 94 UPC. 4.) MUST SCREW DOWN WATE HTR FLU VENT WITH (3) SHEET METAL SCREWS PER JOINT AND & VENT APPLIANCE CONNECTOR. 5.) CHECK GAS PACK ON ROOF FOR APPROVED VALVE.