Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T02PL00053
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2002 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*1.) APPROVED BY R MYERS. | |
01/10/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) PIPING COVERED BEFORE INSPECTION. 2.) PLASTIC PIPE NEED A MINIMUM OF TWELVE INCHES OF COVER 3.) ALL HOSE BIBBS REQUIRE A VACUUM BREAKER. VACUUM BREAKERS ARE NOT INSTALLED UNTIL THE SCREW IS BROKEN OFF 4.) TUCSON WATER ON JUMPERS (UNMETERED ON WATER LINES) |