Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T02OT01987
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2003 | BUILDING - FINAL | Approved | IVRS - Inspection 0000* | |
01/02/2003 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) SEE NOTES 2 & 4 ABOVE 2.) IF YOU WANT TO PUT SHEETROCK ON PARTITION THEN REBUILD PARTITION USING CONVENTIONAL FRAMING METHODS. IE..STUDS 24" ON CENTER MAXIMUM B.) STUDS FULL HEIGHT TO TOP PLATE C.) HEADER CONTINUOUS OVER DOOR OPENING. D.) FASTEN BOTTOM PLATE TO FLOOR USING AN APPROVED METHOD. |
|
12/23/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* 1.) POST SIGN "USING 1" TALL LETTERS "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED OVER FRONT DOOR. 2.) 2 X 4 DIVIDER IN STORE NEEDS TO BE SECURED TO FLOOR. REPAIR AS DISCUSSED. 3.) BLANK OFF OPEN SPACES IN ELECTRIC PANEL. 4.) FLOOR IN BATHROOM TO BE IMPERMEABLE. TO A HEIGHT OF 6" ABOVE SURFACE. |