Inspection Status: Not ready for Inspection
Inspection History: SIGN ELECTRIC
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2002 |
SIGN ELECTRIC |
|
Not ready for Inspection |
IVRS - Inspection 0000*CANCELLED BY PERMIT HOLDER. |
| 10/11/2002 |
SIGN ELECTRIC |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 10/11/2002 |
SIGN ELECTRIC |
|
Denied |
IVRS - Inspection 0999*A. REINSPECTION FEE MUST BE PAID. 1.) DISCONNECT AT SUB PANEL MUST BE ABLE TO BE LOCKED IN OPEN POSTION. THIS IS BECAUSE THERE IS NO DISCONNECT @ SIGN. 2.) PROVIDE NAME & LICENSE # OF CONTRACTOR WHO INSTALLED SIGN. 3.) PROVIDE APPROVED SHOP DRAWINGS FOR SIGN. |
| 09/25/2002 |
SIGN ELECTRIC |
|
Partial Approval |
IVRS - Inspection 0000*EXISTING ELECTRIC FEEDER FROM #17 IN SUB PANEL IN OFFICE. 2.) PHOTO CELL CONTROL @ SE CORNER OF 710 #1. |
| 09/12/2002 |
SIGN ELECTRIC |
|
Not ready for Inspection |
IVRS - Inspection 0000* |