Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2003 | MECHANICAL - FINAL | Approved | IVRS - Inspection 0000*CORRECTIONS OK. | |
| 01/08/2003 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection 0000*1.) PAINT EXPOSED PVC & FITINGS W/LATEX PAINT. GLUE FITTING AT UNIT. 2.) USE A BUSHING OR CHASE NIPPLE WHERE ELEC. WIRES PENETRATE CABINET OF A/C UNIT. WHEN ATTACHING AN SLB TO THE CIRCUIT PANEL, YOU MUST USE A LOCK NUT ON THE FITTING. THE LOCK NUT DIGS INTO THE METAL ON THE PANEL & CREATES ON ADEQUATE BOND. LABEL THE CIRCUIT BREAKER FOR THE A/C UNIT. RECALL FOR INSPECTION. |