Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/27/2002 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 09/26/2002 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 09/25/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0999* |
| 09/20/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0215*1.) SERVICE CONDUCTORS AND LOAD CONDUCTORS CANNOT BE ENCLOSED IN THE SAME WIREWAY (GUTTER). 2.) ALL NIPPLES CONNECTED TO THE GUTTER MUST BE BONDED WITH BONDING BUSHINGS. BOND BOTH ENDS OF NIPPLES AT CT CAN & DISCONNECT. THE CONNECTION OF THE GROUNDING BAR TO THE GUTTER IS SUBSTANDARD. THE BAR DOES NOT HAVE FULL SURFACE CONTACT WITH THE METAL OF THE CAN WALL. CLEAN THE SURFACE OF ALL PAINT AND RE MOUNT. 4.) ADD ANOTHER SET OFCONDUIT STRAPS TO THE RISER CONDUITS. MUST BE WITHIN 8" OF CT CAN (OR CLOSER). 5.) LEAVE PANEL COVERS OFF FOR INSPECTION. 6.) BOND RISER CONDUITS W/BOND CONDUITS W/BOND BUSHING & WIRE TO TERMINAL ON CAN. 7.) TIGHTEN LOCKNUT ON CONNECTOR & USE FILE BUSHING FOR CONDUIT TO METER CAN. |