Inspection Status: Partial Approval
Inspection History: ELECTRIC - RECONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 09/30/2002 |
ELECTRIC - RECONNECT |
|
Partial Approval |
IVRS - Inspection 0000* |
| 09/25/2002 |
ELECTRIC - RECONNECT |
|
Denied |
IVRS - Inspection 0999*WAS ON SITE TO MEET CONTRACTOR AND OWNER NO SHOW. |
| 09/23/2002 |
ELECTRIC - RECONNECT |
|
Denied |
IVRS - Inspection 0935*CALLED 30 MIN PRIOR NO ONE ON SITE. NO WORK PROGRESS A REFEE HAS BEEN ASSESSED. |
| 09/20/2002 |
ELECTRIC - RECONNECT |
|
Not ready for Inspection |
IVRS - Inspection 0000*CANCEL BY OFFICE. |
| 09/19/2002 |
ELECTRIC - RECONNECT |
|
Partial Approval |
IVRS - Inspection 0000*1.) PLEASE PROVIDE "R" PINS AND FUSES FOR DISCONNECT. 2.) PLEASE CORRECTLY ADDRESS SERVICES/METERS WITH PERMANENT METAL ADDRESS LABELS. 3.) A/C DISCONNECTS IN HAZARDOUS CONDITION. 4.) FILL UNUSED OPENINGS IN BOXES. WE ALSO HAVE EXPOSED CONDUCTORS. 5.) FINISH ITEMS 1,4,5,6,7,8 OF PRECIOUS INSPECTION 6.) HAVE A LETTER FROM LICENSED ELECTRICAL CONTRACTOR ON SITE ACCEPTING LIABLITY FOR WORK PREFORMED. |
| 09/18/2002 |
ELECTRIC - RECONNECT |
|
Denied |
IVRS - Inspection 0920*DENIED LOCKED NO ONE ON SITE TO OPEN OR GIVE INFO ON CORRECTIONS REQUESTED. |
| 09/16/2002 |
ELECTRIC - RECONNECT |
|
Not ready for Inspection |
IVRS - Inspection 0000*CANCEL BY OFFICE. |
| 09/06/2002 |
ELECTRIC - RECONNECT |
|
Denied |
IVRS - Inspection 0999*PLEASE HAVE INSPECTION CARD ON SITE 2.) REPLACE MISSING RECEPTACLE COVERS. 3.) SERVICE EQUIPMENT WATER PROOF HAS BEEN VIODED WITH HOLES DRILLED INTO EQUIPMENT. BREAKER COVER MISSING 4.) PLEASE LABEL SERVICES.5.) WE HAVE EXPOSED CONDUCTORS AT FRONT CANOPY. 6.) ALL DISCONNECT ON ROOF IN DETERATED CONDITION AND NOT WETHER PROOF.7.) SUBPANEL FEEDER CONDUIT ON ROOF IS SEPERATING. VERIFY CONDUCTOR CONDITION. 8.) PLEASE, HAVE A LICENSED ELECTRICAL CONTRACTOR PERFORM WORK AS REQUIRED. |