Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/30/2002 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000*OK TO CLEAR SENT TO TEP ON 10/1/02 AT 9:15PM. |
| 09/19/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0210* CORRECTION REQUIRED: 1.) INSTALL A NEW GROUNDING SYSTEM CONSISTING OF TWO 5/8 GRD. BOND COLD WATER AND GAS PIPING TO PANEL OR GROUNDING CONDUCTOR. 2.) LOCKNUT NEED ON 1/2" EMT AT BOTTOM OF PANEL. 3.) CIRCUIT BREAKERS MUST BE OF SAME MANUFACTURER OR PROVIDE WRITTEN PROOF FROM CUTLER HAMMER ALLOWING OTHER PANEL CB IN THIEIR PANEL. SEE PANEL COVER INSTRUCTIONS. |