Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2003 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000*Sent to T E P on 2/24/03 at 9:15am. ok to clear upgrade. | |
| 02/11/2003 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999*NO WORK PROGRESS A REFEE MAY BE ACCESSED IF THESE DISCREPENCY ARE NOT TAKE CARE OF. | |
| 01/03/2003 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999*CALLED TO HOLD OVER 1.) BONDING JUMPER FOR RISER TO BE SIZED PER 250-102 & 250-66. 2.) MAIN BONING JUMPER LUG TO CORRECTLY SIZED FOR CONDUCTOR PER LISTING WE HAVE A #2 CONDUCTOR IN A LUG LISTED 3/0 800 MCM. 3.) BONDING DEVICES ARE NEEDED ON ALL FITTINGS UNTIL THE FIRST DISCONNECTING MEANS 250-96. 4.) WHERE IS WATER BOND? 5.) PLEASE PROVIDE PLANS TO VERIFY FUSES ALSO PROVIDE FUSES. |
|
| 01/02/2003 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/23/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0245*INSTALL MAIN BOND JUMPER TO NEUTRAL IN LUGS FROM GROUNDING ELECTRODE PER ART 250 NEC. 2.) LABEL DISCONNECT SWITCHES AS TO LOAD SERVED. 3.) BOND WATER PIPING |