Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T02EL01748

Parcel: 117200290


Addresses:

260 S CHURCH AV


Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T02EL01748

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/06/2003 ELECTRIC - FINAL Approved IVRS - Inspection 0000*ELECT FINAL APPROVED
GENERATOR LISTING OK THUR DAVE MANN IN FILES.
12/20/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*TO BUILDING OFFICAL APPROVAL OF CE REPORT ON GENERATOR. APPROVED SUBJECT TO BUILDING OFFICAL APPROVAL ON CE REPORT ON GERNATOR.
12/16/2002 ELECTRIC - FINAL Partial Approval 1.) NEED PERMANENT ID ON VFD FOR EXT PUMP 6, ALSO ON NEW VFD FOR EVAP COOLER.
2.) ID NEW SWBD AS "NEW SWBD" THE NEW BOARD OFF HOUSE SWBD.
3.) ID MAIN SW ON THIS BOARD AS "BEING BUSS TAPPED FROM HOUSE SWBD"
4.) ITEMS 16 & 17 ON SHEET E-1 NOT IN
5.) CONNECT PNL H SCHEDULE
6.) PLAN SHOWS CWP 1 & 2 ON SITE UNITS MARKED 3 & 4.
7.) FINISH PNL SCHEDULE MLLE
8.) SECURITY SYSTEM NOT COMPLETED OTHER CONTRACTOR.
9.) GENERATION IS NOT LISTED BY ANY TESTING FACILITY APS ENG TO VERIFY IT PER 99 NEC 110-3 ALSO AMPERAGE LISTED ON UNIT 1931A PLAN SLOWS 2396A.
10.) ENCLOSURE FROM CONDUITS TO PIPE ON GENERATOR FEED PLEASE GROUND TO ENCLOSURE NOT JUST UFER AT GENERATOR.
11.) CORD FEEDING GLYCOL PUMP SHOULD BE IN RACEWAY.
AS BUILT DRAWINGS TO BE PROVIDED TO CITY OF TUCSON FACILITIES MANAGEMENT AND DEVELOPEMENT SERVICES FOR RECORDS.
11/14/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*/ 1) 75 KVA TRANS FROM H1-NEUTRAL NEEDS MAIN BONDING JUMPER TO UFER-SECONDARY NEUTRAL JUST TIED CAN. 2) REVISION NEEDED TO H-1 PNL FROM 225A TO 400A AND FEEDER AND TIE IN CHANGE #4 "EMT-NEEDS BUSHING 3) GENERATOR SW GEAR-CONDUIT BUSHINGS HAVE A #6 COPPER TO 11 PIES AND #6 TO 11 CONDUITS BELEIVE GROUND JUMPER S/B LARGER WILL CHECK BOOM 11 PARALLEL FEEDERS FROM GENERATOR TO SW GEAR-CONDUITS NOT BONDED TO ENCLOSURE 5) MEC-E ALL CONDUITS ENTERING-GROUND BUSHINGS 6) HOUSE PNL-REVISION FOR TIE IN DIRECTLY TO BUS-NEW 1200A SW GEAR ADDED, BOLTED TO 4 7) COLLER UFD UNIT OK 9) MANHOLE PARALLEL RUNS GROUNDING TO BUSHINGS #4, 6 TO 5-3" #6 TO 6-3" CONDUITS, PROVIDE UPDATED REVISIONS WHEN POSSIBLE WILL DEFINITELY NEED FOR FINAL
11/14/2002 ELECTRIC - FINAL Partial Approval 1.) ROOF AREA OK 2.) 250-96A BONDING OF ENCLOSURES, METAL RACEWAYS THAT ARE TO SERVE AS GROUNDING CONDUCTORS WITH OR WITH OUT THE USE OF SUPPLEMENTARY EQUIPMENT GROUNDING CONDUCTORS SHALL BE AFFECTIVELY BONDED. WHERE NECESSARY TO ENSURE ELECTRICAL CONTINUITY AND CAPABILITY TO CONDUCT SAFELY ANY FAULT CURRENT.
250-102 EQUIPMENT BONDING JUMPERS ON ANY CIRCUIT OF THE LOAD SIDE OF THE SERVICE THIS SECTION TELLS HOW TO SIZE THE EQUIPMENT BOND JUMPER FOR SECTION ABOVE.
3.) TRANS FORMER TIE BETWEEN NEUTRAL AND 250-30 GROUNDING SEPERATELY ALTERNATING CURRENT SYSTEMS A2 THE GROUNDING ELECTRODE CONDUCTOR (TO REBAR) SHALL BE CONNECTED TO THE GROUNDED CONDUCTOR NEUTRAL OF DERIVED SYSTEM 120/208, NOW THE UFER IS JUST TIED TO THE ENCLOSURE SO A MAIN BONDING JUMPER NEED TO CONNECT IT TO NEUTRAL OR IT WOULD BE FLOATING.
11/13/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*
10/23/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*1.) ALL UNDERGROUND CONDUITS HAVE BEEN INSPECTED IN SLAB AREA. 2.) GROUND RING AND TAILS INTO BUILDING SECTIONS HAVE BEEN CHECKED. 3.) ALL UNDERGROUND CONDUITS FROM GENERATOR BLD. TO MANHOLE TO EXISTING SWITCH GREAR HAVE BEEN INSPECTED. 4.) CONDUITS FROM NEW 13.8 VOLT DISCONNECT TO EXISTING TEP TRANSFORMER HAVE BEEN INSPECTED. 5.) WILL REQUEST MY OWN COPY OF STAMPED PLANS TO START CHECKING GENERATE ROOM EQUIPMENT, NEW CONTROL BROAD, ELECT PANEL AND TRANFORMER AND ALL OTHER EQUIPMENT.
10/21/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*