Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
Permit Number - T02EL01571
Inspection Description - ELECTRIC - SERVICE UPGRADE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2002 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection 0000* | |
08/16/2002 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | IVRS - Inspection 0000*MEET WITH CONTACTOR REPRESSITIVE AND WENT OVER JOB. | |
08/12/2002 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0999*1.) PERMANENT METAL ADDRESS LABEL ARE NEEDED 2.) MAUFACTURES HOLD DOWN DEVICES ARE REQUIRED ON MAIN BREAKERS 3.) SHEET METAL SCREWS CAN NOT BE USED FOR BONDING 250-8. 4.) PLEASE CLEAN UNDER LUG 250-12. 5.) PLEAE COMPLETE #4,#5,& #8 FOR PREVIOUS INSPECTION. | |
08/05/2002 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0999*THIS IS NOT A SERVICE UPGRADE. IT IS A NEW SERVICE 1.) ADDRESS DO NOT MATCH PERMIT. 2.) PLEASE VERIFY FEEDER CONDUCTORS PASSING THROUGH 1ST BUILDING 3.) PLEASE VERIFY UNDERGROUND INSPECTIONS FOR FEEDER CONDUIT 4.) USE AN APPROVED CONNECTOR FOR SE CABLE AT JUNCTION BOX 5.) BOND JUNCTION BOX ENCLOUSER. 6.) GAS BONDING IS REQUIRED AS PER CODE 1ST & 2ND BUILDING.7.) A MAIN DISCONNECTING MEANS WILL BE NEEDED AT 2ND BUILDING 7.) A MAIN DISCONNECTING MEANS WILL BE NEEDED AT 2ND BUILDING AS PER CODE 225-31, 225-32. 8.) NO LOADS CONNECTED AT THIS TIME PLEASE FINISH PANEL. 9.) PLEASE LABEL PANEL WITH AN ADDRESS OR NUMBER.10.) VERIFY WATER BOND TO MAIN SERVICE. |