Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2002 |
ELECTRIC - RECONNECT |
|
Approved |
IVRS - Inspection 0000*CORRECTION MADE PER BLANKEN BAKER ELECTRICAL COMPLETE CLEARANCE HAS BEEN SENT TO TEP ON 9 AM LIST TODAY. |
| 06/04/2002 |
ELECTRIC - RECONNECT |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 06/03/2002 |
ELECTRIC - RECONNECT |
|
Denied |
IVRS - Inspection 0999*SINCE THIS HOUSE IS UNOCCUPIED A ELECTRICAL LICENSED CONTRACTOR HAS TO MAKE CORRECTED ON 1-8 PRIOR TO CALLING FOR NEXT INSPECTION. HAVE CONTRACTOR CALL 791-5550 EXT 136. AND SPEAK TO RAY MAJUTA 1.) SMOKE DETECTOR REQUIRED IN BEDROOMS. 2.) ELECTRICAL WIRING IN OUTSIDE STORAGE ROOM TO BE CORRECTED 3.) RECEPTACLE OUTSIDE BY THE PANEL HAS TO BE REMOVED IT IS WIRED WRONG. 5.) PALO VERDE TREE BLOCKS ACCESS TO PANEL OUTSIDE 6.) ROMEX ABOVE PANEL TO BE PHYSICALLY PROTECTED TO 8' 7.) METER TO HAVE PERMANENT ADDRESS NO MARKER 8.) CORRECT COVER WIRING. |