Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
Permit Number - T02EL01019
Inspection Description - ELECTRIC - SERVICE UPGRADE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2002 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection 0000* | |
05/30/2002 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0210*CORRECTIONS 2ND SERIES 1.) THE GROUND RODS MUST BE SET (6') SIX FEET APART OR GREATER BUT NOT CLOSER. 2.) THE GROUND WIRE CANNOT BE SPLICED WITH MECHANICAL CONNECTORS. THE ONLY ACCEPTABLE METHOD OF SPLICING IS BY CRIMP SLEEVE OR CAD WELD OR SILVER SOLDER. 3.) BOND THE COLD WATER PIPE TO THE GAS PIPE. THIS CAN BE DONE AT THE WTR. HEATER. CORRECT & RECALL. | |
05/20/2002 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0210*CORRECTIONS REQUIRED. 1.) THE SERVICE PANEL MUST BE LOWERED SO THAT THE HIGHEST CIRCUIT BREAK POSITION IS NOT HIGHER THAN 6' 7" FROM GROUND LEVEL. 2.) THE WIRING RUN THROUGH THE UTILITY SECTION OF THE MAIN PANEL MUST BE REMOVED. THIS SECTION IS FOR THE EXCLUSIVE USE OF THE TEP-UTILITY CO. AND WILL BE SEALED. SEAL THE HOLES CUT INTO IT. 3.) REMOVE THE CHASE NIPPLES USED TO ATTACH THE LB FITTINGS TO THE MAIN PANEL AND USE SHORT THREADED NIPPLES WITH LOCKNUTS INSTEAD. THE CHASE NIPPLES DO NOT PROVIDE SOLID GROUND BONDING TO THE CONDUIT SYSTEM.4.) LEAVE A SAMPLE OF THE WIRE USED FOR THE SERVICE. MUST BE SUNLIGHT RESISTANT 5.) INSTALL TWO 2 STRAPS TO THE RISER CONDUIT 6.) BOND GAS PIPING AND BURY OR STRAP GRD. WIRE TO WATER LINE. |