Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - UFER
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2002 |
ELECTRIC - UFER |
|
Approved |
IVRS - Inspection 0000*INTERIOR OF PERMANENT STRUCTURE NOT TO BE USED IN ANY MANNER. 3 PHASE SAW MUST BE USED IN CLOSE PROXIMITELY OF PROVIDED 3 PHASE RECEPTACLE IE. NOT OVER 8 FT. |
| 05/30/2002 |
ELECTRIC - UFER |
|
Denied |
IVRS - Inspection 0999*1.) NEED NAME AND TELEPHONE NUMBER OF REQUIRED L-11 ELECTRICAL CONTRACTOR. THIS BEFORE NEXT INSPECTION. 2.) TRANSFORMER AT POLE INDICATE A WYE SYSTEM, METER BASE INDICATE A "HIGH LEG" AND COLOR CODE SEQUENCE MISAPPLIED. 3.) 4" RISER CONVERTED TO 2 1/2" ENTRY INTO METER BASE NOT APPROVED. A. HUB NOT LISTED FOR B. SHEET METAL SCREWS C. WILL ALSO NEED GROUNDING BUSHING AND JUMPER. (ALL DEPENDS ON FINAL CONFIGURATION) 4.) NEED K CLIPS. 5.) IMPROPER ROD CLIPS. 5.) IMPROPER ROD CLAMPS. 6.) NO PLAN. 7.) GROUND ELECTRODE CONDUCTOR TO TERMINATE AT NEUTRAL BAR OF MAIN. 8.) LOOSE GROUNDS AT MAIN. 9.) NEED GROUND BUSHING AND BOND, JUMPER THROUGHOUT 10.) GAS & WATER BOND. A FOLLOW UP IS IN ORDER FOR FUTURE NOTE: 30 DAYS THANKS. |