Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2002 |
ELECTRIC - FINAL |
|
Approved |
|
| 06/20/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*1.) COLD WATER BOND NOT SIZED PER NEC. ALSO SEE PLANS. 2.) SEE ITEMS #2 LAST INSP. WRITE UP. |
| 05/29/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*NOTES 1.) NEED REVISED APPROVED PLANS TO INDICATE CHANGE MADE IN FIELD 2. METAL RACEWAY USED FOR GROUNDING ELECTRODE CONDUCTOR MUST HAVE BOND BUSHINGS AT TERMINATIONS OR PER ART 230-NEC. 3.) BOND WATER PIPING. 4.) EMT CONDUIT MUST BE SUPPORTED WITHIN 3' OF TERMINATION PER 348 NEC. |
| 05/24/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0945*CALL PH# PER MSG. LEFT MSG ON CONTR'S VOICE MAIL, GAVE 1/2 HOUR LEAD TIME ETA. NO SHOW, COULD NOT LOCATE WORK BEING DONE TO INSPECT. |