Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/11/2002 |
ELECTRIC - SERVICE UPGRADE |
|
Approved |
IVRS - Inspection 0000* |
| 02/01/2002 |
ELECTRIC - SERVICE UPGRADE |
|
Partial Approval |
IVRS - Inspection 0000*PLEASE CALL FOR FINAL ONCE TRANSITION INTO OLD SERVICE IS COMPLETE. |
| 01/30/2002 |
ELECTRIC - SERVICE UPGRADE |
|
Partial Approval |
IVRS - Inspection 0000*1.) BOND BOTH GAS LINER THERE IN 2 GAS METER 2.)TIE GROUNDING SYSTEM TOGETHER 250-58. FINISH BACK FEEDING. |
| 01/28/2002 |
ELECTRIC - SERVICE UPGRADE |
|
Denied |
IVRS - Inspection 0999*1.) GROUND RODE MUST BE A MINIMUM OF 6FT. APART. 2.) DRIVE RODS VERTICALLY INTO GROUND 3.) A PERMANENT ADDRESS TAG ENGRAVED OR METALIC RASIED LETTER/NUMBER IS REQUIRED PER CITY AMEND RIVIT OR SCREW IN PLACE 4.) NEED BONDING JUMPER AT RISER. TIE GROUND TOGETHER NEED GAS BOND CONDUITS INSTALLATION WILL NEED A LICENSED C-11 CONTRACTOR. |