Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2003 | ELECTRIC - RECONNECT | Not ready for Inspection | IVRS - Inspection 0000* | |
| 01/03/2003 | ELECTRIC - RECONNECT | Partial Approval | IVRS - Inspection 0000*MUST CORRECT SERVICE AND SUB PANEL GROUNDING. ISOLATE SUB PANEL, INSTALL GROUND BAR AND JUMPER. GROUND SERVICE PROPERLY. |
|
| 11/05/2002 | ELECTRIC - RECONNECT | Partial Approval | IVRS - Inspection 0000*SENT ON 11/6/02 AT 9:15AM OK TO CLEAR 60 DAYS ONLY. 1.) OK TO CONNECT FOR SIXTY 60 DAYS ONLY TO PERMIT CLEANUP OF INTERIOR WIRING. | |
| 01/07/2002 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection 0930*THE FOLLOWING ITEMS REQUIRE CORRECTION. 1.) THE ELECTRICAL METER AND MAIN SERVICE SWITCH WERE RELOCATED ( AT SOME TIME) AND ARE NOT PROPERLY GROUNDED. 2.) THE BEDROOM DON'T HAVE A LIGHTING OUTLETS B. SMOKE DETECTORS. C. HALLWAYS DONT HAVE SMOKE DETECTORS. 3.) BATHROOM LIGHT FIXTURES ARE NOT PERMANENTLY WIRED. 4.) ROOMS WERE ADDED WHERE CARPORT/GARAGE ONCE EXISTED. THERE IS NO RECORD OF ANY PERMIT FOR THIS WORK. THE WORK WAS NOT DONE TO APPLICABLE CODES. PLEASE CONSULT WITH A PROFESSIONAL ELECTRICAL CONTRACTOR FOR THE WORK OF REPAIR/CORRECTIONS. |