Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/07/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 04/03/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) HOLDOWN AT KITCHEN NUT LOOSE AND NOT NAILED 2) SEE #2 AND #6 FROM PREVIOUS INSPECTION 3) COMPLY WITH DETAIL 53 AND 54 PAGE AD3 4) NEXT FAILURE WILL RESULT IN A RE-FEE |
| 03/27/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) ANCHOR BOLT MISSING AT PLATE WITHIN 12" OF CUT AND LOOSE ANCHOR BOLT NUTS THROUGHOUT 2) LUS 48" FOR FLOOR TRUSSES NOT NAILED PROPERLY 3) CHECK ENTIRE SUB FLOOR MIXED WITH NAILS, ALL FLOOR SHOULD BE SCREWED 4) NO INSULATION BEHIND TUB 5) IF COUNTER WILL EXCEED MORE THAN 16" OVERHANG AT KITCHEN PONY WALL OUTLETS NOT ALLOWED 6) PROTECT ELECTRICAL AT HALL BATH WITHIN 1 1/4 FROM EDGE OF STUD 7) STOPPED INSPECTION HAVE SUPERVISOR WALK HOUSE BEFORE RECALL |