Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/07/2003 |
MECHANICAL - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000*/ 2ND FLOOR. |
| 10/03/2003 |
MECHANICAL - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*/ 2ND FLOOR. |
| 10/01/2003 |
MECHANICAL - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*/ SEAL ALL SUPPLY/RETURN DROPS IN LID./ 2ND FLOOR |
| 09/17/2003 |
MECHANICAL - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*/1) CORRECT OVERFLOW CONDENSATE DRAINS OFF OF AIR HANDLERS. 2) RM. 117 - REROUTE FLEX DUCTS, CROWDING GRID DOWN AS INSTALLED. |
| 08/25/2003 |
MECHANICAL - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*/1) ACCESS PANEL - IN CEILING LOCKER ROOM TO AIR HANDLER CONTROL PANEL. 2) OK TO COVER ACTIVITY ROOM, OFFICES. LEAVE TILES OPEN AT DURO DYNE DAMPER LOCATION. |
| 08/12/2003 |
MECHANICAL - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*/1ST FLOOR LOCKER RMS. ELEVATOR RM. BATHRM. HARD CEILINGS, OK TO COVER. |