Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
Permit Number - T02CM05926
Inspection Description - MECHANICAL - ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2003 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection 0000*/ 2ND FLOOR. | |
10/03/2003 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/ 2ND FLOOR. | |
10/01/2003 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/ SEAL ALL SUPPLY/RETURN DROPS IN LID./ 2ND FLOOR | |
09/17/2003 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/1) CORRECT OVERFLOW CONDENSATE DRAINS OFF OF AIR HANDLERS. 2) RM. 117 - REROUTE FLEX DUCTS, CROWDING GRID DOWN AS INSTALLED. | |
08/25/2003 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/1) ACCESS PANEL - IN CEILING LOCKER ROOM TO AIR HANDLER CONTROL PANEL. 2) OK TO COVER ACTIVITY ROOM, OFFICES. LEAVE TILES OPEN AT DURO DYNE DAMPER LOCATION. | |
08/12/2003 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/1ST FLOOR LOCKER RMS. ELEVATOR RM. BATHRM. HARD CEILINGS, OK TO COVER. |