Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/29/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
|
| 10/24/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
1) INSTALL ALL CO TO GRADE, CONDENSATE AT WATER HEATERS, GAS LINE PRESSURE TEST, WC PROVIDE 15" CLEARNACE ON W/C 18 ON H.C. 2) VACCUM BREAKERS AT UR MINIMUM 6", VACCUM BREAKERS AT HOSE BIBS LETTER ON IRRIGATION LOCATION, ADA-UR AND CLEAR FLOOR 3) SEE ADA ON DRINKING FOUNTAIN, ANCHOR EXPANSION TANKS, OK FOR TEMP C OF O SUBJECT TO STEVE LONG |
| 09/12/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) WILL REQUIRE TEST ON COMPLETE SYSTEM WHEN ALL GAS PIPING IS COMPLETE. WELD PIPE OK |
| 09/05/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
|