Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/01/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) COMPLETE DOWN SPOUTS 2) CODE VIOLATION ON RELIEF LINE-CROSS CONNECTION 3) PROVIDE APPROVED REVISED PLAN 4) PROVIDE LETTER ON INSULATION FOR WATER PIPING 5) FLOOR PLAN GRATE 6) BOND REQUIRED FOR TEMP C OF O 7) THIS IS NOT A COMPLETE LOST |
| 07/30/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
PROVIDE BOND FOR TEMP C/O NEED REVISED PLAN , THIS NOT A COMPLETE INSP |
| 07/28/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NEED REVISED PLAN |
| 07/23/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* NO INSP MADE, NEED APPROVED REVISED PLANS AS PER REQUEST. |