Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/11/2003 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 12/09/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE POST TENSION TAG |
| 12/05/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) INSTALL PT TAG AT COLD WATER SERVICE 2) UFER REQUIRES #4 3) BOND GAS LINE 4) INSTALL OUTLETS AT WASHER AND ENTRY 5) INSTALL DRIP LEG AT WATER HEATER 6) 12" X 12" CLEAR OPENING REQUIRED AT RETURN AIR 7) OUTLET UNDER SINK IS PARTIALLY COVERED |
| 12/04/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) A/C SHALL NOT BE IN FRONT OF ELECTRIC DISCONNECT 36" MINIMUM CLEARANCE IN FRONT AND REQUIRED 2) PAINT ABS VENT AT ROOF 3) POST ADDRESS |