Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/20/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000*/ 1) ALL PLUMBING TOP-OUT OK |
| 03/18/2003 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NAIL POPOUT AT 6" ON CENTER WITH 1 1/4" PENETRATION INTO FRAME MEMBER NOTE: PLUMBING INTERMEDIATE IS PARTIALLY APPROVED UNTIL TUB OVER FLOW IS TESTED |
| 03/13/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) WATEER TEST REQUIRED ON PLUMBING TOP OUT 2) TRANSFER ALL NOTES-TRUSS AND BEAM SIZE FROM ENGINEER DRAWING TO ARCH-DRAWING 3) PROVIDE POSITIVE CONNECTION AT ALL POST BEAMS 4) CHECK BATH GFCI 5) NOTE: FRAMING INTERMEDIATES ARE ONLY APPROVED AFTER STUCCO MESH IS APPROVED |