Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*REVISED PLANS ON JOB. ALSO COPY OF BACKFLOW INSP. |
|
| 04/02/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/12/2003 | PLUMBING - FINAL | Not ready for Inspection | 1. PLEASE SEE INSPECTION REQUEST AS OF 2/5/03 2 2.) NO PLAN ON KITCHEN EQUIPT. 3.) BACKFLOW DEVICES NOT IN PLACE OR TESTED AT THIS TIME. 4.) LAST INSP ON BOILER WAS "93" 5.) PLEASE ANCHOR ALL GAS LINES ON ROOF AS NEEDED & PROVIDE TEST AS PER LAST REQUEST. 6.) SUPER HAS HAND OUT FOR TEMP C OF O TALK WITH STEVE LONG. |
|
| 12/24/2002 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) P.O.C. OF NEW BLDG DRAIN TO EXSISTING BLDG. DRAIN IS OK 3.) OK TO BACKFILL TRENCH. |