Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T02CM05650

Parcel: 13316004E

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
05/09/2003 PLUMBING - FINAL Approved IVRS - Inspection 0000*REVISED PLANS ON JOB.
ALSO COPY OF BACKFLOW INSP.
04/02/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*
02/12/2003 PLUMBING - FINAL Not ready for Inspection 1. PLEASE SEE INSPECTION REQUEST AS OF 2/5/03 2
2.) NO PLAN ON KITCHEN EQUIPT.
3.) BACKFLOW DEVICES NOT IN PLACE OR TESTED AT THIS TIME.
4.) LAST INSP ON BOILER WAS "93"
5.) PLEASE ANCHOR ALL GAS LINES ON ROOF AS NEEDED & PROVIDE TEST AS PER LAST REQUEST.
6.) SUPER HAS HAND OUT FOR TEMP C OF O TALK WITH STEVE LONG.
12/24/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK
2.) P.O.C. OF NEW BLDG DRAIN TO EXSISTING BLDG. DRAIN IS OK
3.) OK TO BACKFILL TRENCH.