Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2003 | PLUMBING - INTERMEDIATE | Approved | ||
| 04/02/2003 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/14/2003 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*WORK ON NEW ATER NOT COMPLETE AT THIS TIME. NO PLAN OR APPEAL FOR LOCATION OF ANSUL VALVE. ALL FIXTURES NOT INSTALLED AT THIS TIME. CORRECTIONS HAVE NOT BEEN MADE ON GAS LINES ON ROOF. C OF O SUBJECT TO STEVE LONG.NOTE NO GAS CARD GIVEN. NO INSP FROM BUILDING INSP. AT THIS TIME. |
|
| 02/05/2003 | PLUMBING - INTERMEDIATE | Partial Approval | ||
| 01/29/2003 | PLUMBING - INTERMEDIATE | Not ready for Inspection | SUPER HAS HAND OUT FOR TEMP C OF O TALK W/STEVE 1.) PLEASE PROVIDE PRESSURE TEST ON COMPLETE SYSTEM FOR GAS CODE VIOLATION ON ANSUL VALVE ABOVE CEILING. REMOVE UNIONS PROVIDE APPROVED REVISED AS BUILD DRAWING PROVIDE HANGERS AS NEEDED YOU MAYBE REQUIRED TOP PROVIDE APPEAL FOR LOCATION OF VALVE. |
|
| 01/09/2003 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* | |
| 01/06/2003 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*TEST ON COPPER OK PROVIDE INSULATION AS NEEDED. |