Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2003 | PLUMBING - ROUGH, SOIL | Approved | ||
| 06/19/2003 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999* | |
| 01/31/2003 | PLUMBING - ROUGH, SOIL | Partial Approval | 1.) SK DRAWING REVISED NOW SHOWS 3" BLDG DRAIN. 2.) PLUMBING INSTALLED PER APPROVED REVISED PLAN WITH EXCEPTION AT TOILET RM #108. HORIZONTAL VENT NOT NECESSARY 3.) OK TO COVER ALL AREAS EXCEPT RM #108. 4.) WATER TEST ONE RISER TO TEN FEET. |
|
| 01/27/2003 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*SORRY SEE PLUMBING KEY NOTES #3. THEN HAVE YOUR PLUMBER LOOK ON P-1 LINE DRAWING WITH #3 3" HAS BEEN INSTALLED. PLANS CALL FOR 4" ALSO SEE TOILET ROOM #108. 3" STUB UP IN WALL & WHY FLAT VENT ON WC FOR TOILET ROOM #108 SEE RISER DIAGRAM? CONDENSATE TRAP DETAIL. |
|
| 01/16/2003 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* |