Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2003 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 01/09/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) NO FOOTINGS UNDER EXTERIOR WALLS. YOU MUST EXCAVATE 12" BELOW GRADE AND 12" UNDER SLAB TO INSTALL FOOTING AND 2 EACH #4 REBAR PER PLAN. ALSO BEARING POSTS MUST HAVE ADDITIONAL 18 X 18 X 12" DEEP FOOTINGS WITH 3 #4 REBAR EACH WAY |
| 01/07/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) NEED VERIFICATION OF FOOTINGS AND ROOF SHEATHING (COVERED WITHOUT INSPECTION) 2) INSTALL BEAM TO POST CONNECTIONS 3) POST TO BE MINIMUM 1" ABOVE CONCRETE 4) INSTALL DOUBLE STUDS OR 4 X 4 POST UNDER BEAMS AT BEARING 5) INSTALL H2.5'S RAFTERS TO BEARING 6) FILL ALL NAIL HOLES IN H2.5'S AND POST TO BEAM CONNECTIONS 7) STRAP BEAM EACH END AT BEARING 8) EXTERIOR SHEATHING TO BE NAILED OFF TO TOP AND BOTTOM PLATES AND ALL STUDS OR ADD H2.5'S BOTTOM PLATE TO STUD AND STUD TO TOP PLATE |