Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*REVISED CITY APPROVED PLAN ON SITE APPROVED | |
| 12/13/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/19/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/23/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/03005-SEE NOTE #1 FROM 7/19/04 INSPECTION 03075- 1 1/4 GAS PIPING FROM BUILDING UNDERGROUND TO METER LOCATION 14 PSI TEST OK. | |
| 07/19/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) 4" BLDG SEWER FROM 2-WAY CLEANOUT TO TIE IN TO 6" SEWER WATER TEST OK PENDING REVISED CITY APPROVED PLAN OF THIS INSTALLATION 2) 60 PSI AIRT TEST ON 2" COPPER FROM METER LOCATION ACROSS DRAINAGE TRANSITION TO 2" PVC SCHEDULE 40 TO BACKFLOW PROTECTION DEVICE OK PENDING CITY APPROVED REVISED PLAN SHOWING THIS INSTALLATION 3) HAVE YOUR PERMIT CARD AND APPROVED PLAN ON SITE AT ALL TIMES | |
| 05/12/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ WTR TEST FROM BLD 2-WAY C.O. BACK INTO BLD FOR ALL UNDERSLAB WASTE AND VENT TO 2' ABOVE FINISHED FLOOR OK. CALL IN FOR INSP FOR PRE-SLAB PIPE WRAP AND TRAP PRIMERS. | |
| 05/11/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ 1) AIR OR WTR TEST ALL PIPING. 2) PROVIDE ALL PIPING WITH AT LEAST ΒΌ" PER FOOT FILL 3) NORTH REST ROOM LAV AND FLOOR SINK DRAINAGE WILL REQUIRE FULL SIZE UPPER TERMINAL C.O. 4) INSTALL BLD SEWER PER PLAN OR HAVE REDLINES ON SITE FOR COMPARISON TO FUTURE CITY APPROVED REVISED DRAWING 5) BLD SEWER IS UNDER FOOTING OR IN IT. |