Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/18/2005 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 07/07/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) SEE NOTES FORM 4/8/04 AND 4/9/04 |
| 04/09/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ WRAP AND TRAP PRIMERS OK ON PRE-SLAB/ NEED TO HAVE 03055 - HCS ADDED TO INSPECTION CARD. - HCS FROM BLD 2-WAY CLEAN OUT TIED IN PER RED LINE DRAWING TO 6" EXISTING CLAY SEWER WTR TEST OK - PENDING APPROVED DRAWING OF ACTUAL ROUTE OF PIPING. |
| 04/08/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 2" COPPER STUBBED UP IN NORTH WEST CORNER 5' OUTSIDE BLD 60 PSI AIR TEST OK. BLD PRE-SLAB OK. |
| 03/29/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/26/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ PLEASE PROVIDE APPROVED REVISED PLAN ON NEW LOCATION OF BLDG DRAIN. RED LINES ON JOB AT THIS TIME. |
| 03/25/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ NOT READY - WTR TEST DOWN. ALSO PLEASE INSTALL AS PER APPROVED PLAN OR PROVIDE APPROVED REVISED PLAN BY NEXT INSP. SITE WTR NEW LOCATION NO PLAN AT THIS TIME. |