Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2003 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) C OF O |
| 06/24/2003 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 06/12/2003 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 06/10/2003 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*/ 1) INSTALL HOLDOWN TABS FOR LIGHT FIXTURES 2) SUPPORT MC CABLES WITHIN 12" EACH TERMINATION 3) PANEL "AB" NEEDS TO TIE IN TO PANEL "A" PER PLAN 4) SEPERATE NEUTRALS AND GROUNDS IN PANEL "AB" |
| 06/09/2003 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*/ 1) REMOVE CEILING TILE AROUND INSTALLED LIGHT FIXTURES AND CALL FOR ABOVE CEILING INSPECTION 2) CALL FOR FINAL WHEN ELECTRICAL INSTALL IS COMPLETE 3) INSTALL ADDITIONAL SUPPORT FOR 1 1/2" CONDUIT ABOVE PANEL |