Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* | |
| 03/21/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1.) MUST PROVIDE A BACKFLOW PREVENTER FOR EACH DISPENSING MACHINE THAT REQUIRES POTABLE WATER SUPPLY. TESTED CERTIFIED BY TIME OF INSPECTION SEE SECTION: 603.0 94 UPC. 2.) MUST USE DIRECTIONAL FITTING FOR CONTINUOUS WASTE SEE SECTION: 405.4 94 UPC. 3.) MUST PROVIDE DESANKOS FOR 17 GAS TRA ARM 4.) CAN ONLY HAVE (1) SLIP JOINT ON TRAP ARM SER SECTION: 1003.2. 94 UPC. 5.) MUST HAVE MIN 1" AIR GAP ON INDIRECT WASTE FOR PREP SINK. 6.) SUPPLY FOR BACKFLOW PREVENTERS MUST BE THE SMAE SIZE AS INLET SEE SECTION: 610.2 94 UPC. 7.) WILL REQUIRE A REVISED AND APPROVED DRAWING ON WATER DISTRIBUTION SERVING EXTRAS BACKFLOW PREVENTERS PRIOR TO FINAL INSPECTION. |