Permit: T02CM05318

Parcel: 11628001E

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
12/29/2004 BUILDING PRE-SLAB Approved IVRS - Inspection :*
12/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/16/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/15/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/14/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/09/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*1) FOOTINGS OK AT EXTENDED RAMP WALLS OFF PAVILLION
12/07/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/02/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/29/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/24/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/15/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) SOG AROUND POOLS OK
11/09/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
11/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/27/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) STAIR 21 AND 22 OK TO PLACE CONCRETE
10/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/25/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/19/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) STAIR 16 OK
10/15/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :OK TO GUNITE WATER FEATURE WEST OF D
10/14/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/PADS FOR POP OUTS @ H OK
10/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/11/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/05/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
10/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/30/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) BLDG STAIR 16 OK TO PLACE AFTER STEP FORMS ARE PROPERLY SECURED
09/27/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/WHAT PART OF STAIR 16 IS DONE?
01015-DECK NAILING FOR ROOF OVER AREA F OK
09/23/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) STAIR 23 S.O.D. OK
09/15/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/14/2004 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
09/09/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/08/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/02/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :P1-H CANT SLABEK WHEN REPAIR DOWELS EXPOXIED IN
STAIR 33 SOUTH SIDE OK TO PLACE
09/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/31/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) TOP 1/2 OF NORTH SIDE OF STAIR 33 OK
08/30/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/25/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/24/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/18/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) P2/I STAIR 25 OK
08/17/2004 BUILDING PRE-SLAB Denied IVRS - Inspection :
See detailed listing on site.| 999*/DENIED-REINFORCING WHERE EXPOSED TO WEATHER REQUIRES 1 1/2' AT CONCRETE COVER.
01010-AREA F COLUMN BASED NOT READY FORM? UP BEFORE RE-CALLING
08/16/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) STAIR 10 OK 2) STAIR 19 CHAIROVER WALLS AND LEADING OK TO POUR
08/13/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
08/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*1)P2-P1/H STAIR 25 OK
2)P2-P1/C STAIR 3 OK
08/02/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :P1-H STAIR 19 TO FIRST LANDING OK
07/30/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) 1-D PROVIDE RFI FOR MODIFICATION TO DETAIL 259 AT STAIR 10
07/29/2004 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
07/27/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
07/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :SOG AT LOADING DOCK OK PLEASE CLEAN UP LOOSE RUBBLE BY CURB
07/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :P-1/D STAIR 10 NL 1/2 OK
P2-H LOADING DOCK SOG
SW & NE QUADRANTS OK TO PLACE
07/21/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
07/20/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
07/15/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*1/4 SECTION AT LOADING AREA 3.0.6.(?) OK.
07/14/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
07/13/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/29/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/18/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/17/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/14/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/11/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :* AREA F : P1 & 1 OK TO PLACE CONCRETE (3500 psi PER GSN'S)
06/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :* P1 & 1 BRIDGE PROGRESS OK, WWF REQUIRED BEFORE POURING CONCRETE.
06/09/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) P2 AND P1-J S.O.G. FOR BATTER WALLS OK
06/08/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/04/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :* 1) P1-D CLOSURE POUR OK TO PLACE @ LINEN CHUTE WHEN SPEC INSP CONFIRMS EPOXIED DOWEL. 2) 1-G REPAIR @ ELEVATOR SHAFT OK
06/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/28/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/27/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/25/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/24/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) 1-G HOW ARE YOU GOING TO FIX ENLARGED AREA BY ELEVATOR ? RFI #776
05/20/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/19/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) R-7 POUR BACK OK
05/13/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*/ 1) P1-H MECH/ELECTRIC PADS WITH TURN DOWN 80 PERCENT COMPLETE. SPECIAL INSP MAY CONFIRM FINAL STEEL PLACEMENT. OK TO POUR IF SPECIAL INSP CONFIRMS
05/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :* POUR BACKS OK @ P1-D
05/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
05/03/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
04/29/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
04/23/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :* 6-G MILD REINFORCED SLAB OK TO PLACE A) DON'T FORGET EMBED FOR T.S. COL BELOW
04/22/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
04/21/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 5- H PT DECK MAKE MINOR ADJUSTMENTS TO CABLES AS NOTED. OK TO PLACE CONCRETE.
04/20/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 5-H PT DECK 95% COMPLETE FINAL INSP REQ TOMORROW
04/19/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-D SLAB INSPECTED SAT BY SPEC INSP OK EXCEPT: A) WEITZ ADDED A 4' X4' PAD THAT RE REBAR @ ZZ6.5/43. B) NO FOOTING PUT IN PER DETAIL 106. C) NO KEYWAY @ CLOSURE PER DETAIL 119.
04/16/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 1-D SOG WEST SIDE OK. 2) 1-D STAIR 9 & 11 OK. 3) P1-D SOG EAST SIDE OK WHEN SPEC INSP CONFIRMS REENTRY STEET @ CORNERS & EXPANSION JOINTS.
04/14/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 5-G PT DECK OK TO POUR. A) PROVIDE CLARIFICATION AS TO WHETHER OR NOT JAMB STEEL IS NEEDED @ NORTH END OF SW23 @ PENT HOUSE LEVEL.
04/13/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
04/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
04/08/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-H PT SLAB OK TO PLACE
03/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-G PT DECK OK TO PLACE
03/24/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 1-H BEAM 3 OK TO POUR AFTER CONCRETE SLURRY CLEANED OFF BARS & CABLES. 2) 6-D POUR BACK OK.
03/23/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-H ELEVATED SLAB OK TO POUR.
03/22/2004 BUILDING PRE-SLAB Partial Approval 1) 5-D CLOSURE POUR BEING TAKEN OUT. IT WILL REQUIRE REINSPECTION BEFORE PLACING MORE CONCRETE. 2) CURBS VARIOUS AREAS B, C, D OK TO FORM & POUR
03/19/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 6-D CLOSURE STRIP OK. 2) 1-H PT DECK LINE 24-28.2
03/18/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 8-D A) D-WEST ADD PERIMETER BARS AND CLEAN RUBBLE OFF DECK. B) D-EAST COMPLETE TOP MAT & PERIMETER BARS. OK TO PLACE WHEN SPEC INSP CONFIRMS.
03/17/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
03/16/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
03/12/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 6-E POST TENSION SLAB OK TO PLACE a) PLEASE CHAIR STEEL OFF DECK AS INDICATED DURING INSP. b) SPEC INSP MAY CONFIRM.
03/11/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
03/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PT DECKS OK TO POUR
03/06/2004 BUILDING PRE-SLAB Partial Approval AFTER HOURS INSP: 7-D POST TENSION DECK, OK TO POUR
03/05/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 2-H POST TENSION DECK CC-II OK TO PLACE WHEN SPEC INSP CONFIRMS CORRECTIONS AS NOTED @ SITE WITH SUPERINTENDDENT.
03/03/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
03/01/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* I-H CLOSURE POUR OK
02/27/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*S-E PT DECK OK TO PLACE.
02/26/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
02/24/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PT SLAB WEST OF LINE ZZ.4.5 OK TO PLACE WHEN SPEC INSP CONFIRMS CORRECTIONS AS DISCUSSED WITH JD STEEL.
02/23/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
02/18/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
02/17/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 3-B CLOSURE POUR OK. 2) 4-B, 4-D CLOSURE POUR OK. 3) 6-D POST TENSION SLAB ZZ.4.5->LINE 7 OK
02/11/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-B CLOSURE STRIP- STEEL OK BUT YOU MAY NOT POUR STRIP UNTIL PT DECK HAS BEEN SIGNED OFF BY ENG OF RECORD.
2-G PT DECK OK. 4-D PT DECK OK
02/10/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 2-G PT DECK: MAKE CORRECTIONS AS DISCUSSED WITH DAVE & LAWRENCE AT JD STEEL. A) COMPLETE SHEAR HEADS. B) MAINTAIN CLEARANCE UNDER DEPRESSED EDGE FORM. C) MAINTAIN 3/4 CLEAR FROM DECK. D) ADD STEEL BB2/SW 24 & MAT @ BB/7.1
02/09/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PRELIMINARY INSP OF PT DECK-> POUR CONCRETE FOR TONIGHT DUE TO DESIGN CHANGE
02/05/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1-I WEST MEZZANINE SLAB ON STEEL DECK. BLOCK OUT S END @ STAIR.
PM6-B PT DECK OK TO POUR.
02/03/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
02/02/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 6-D PRELIM INSP FOR PT DECK. PLEASE PROVIDE XTRA REINFORCEING @ FENETRATIONS AS DISCUSSED W/ STEVE & JOE MUNOZ & J D STEEL./
PM 6-D PT DECK LINE 18.1 TO LINE ZZ.4.5, OK TO PLACE. AFTER HOURS.
01/29/2004 BUILDING PRE-SLAB Partial Approval 1-H DECK POUR OK. 5-A RESCHEDULED FOR TONIGHT.
01/28/2004 BUILDING PRE-SLAB Partial Approval 5-A PT SLAB OK TO PLACE. (CABLE DETAIL @16.1/F SHOWS UNIFORM TENDON 3' SHORTER . AS BUILT IS 3' LONGER THAN STANDARD. ACTUAL LENGHT NEEDS TO BE MEASURED & RECORDED SO THAT ELONGATION RECORDS WILL BE CORRECT.)
1-H PT SLAB SOUTH OF LINE 28.2 OK TO POUR.
01/27/2004 BUILDING PRE-SLAB Partial Approval 1) 1-H PT SLAB & BEAMS- PRELIMNARY INSP LINE 28.2-LINE31. BEAM 1 LINE 28.4 1) #9 BARS OUTSIDE OF CENTER STIRRUPS NOT 6" O.C. PER DETAIL 240 2) #9 BARS INSIDE OF CENTER STIRRUPS ARE NOT SPACED MIN OF 1 BAR DIAMETER PER ACI 318. 3) #9 TOP BARS WEST OF GG ARE ONLY EXTENED 7' INSTEAD OF 8' NOTED ON PLAN. 4) #6 TOP BARS WEST OF GG ONLY HAVE 32" LAP WITH #9'S INSTAEAD OF 42" LISTED ON PLAN. 5) ALL TOP BARS TO BE TIED UP SECURELY @ENDS. 6) CITY PLAN FOR BEAM WEST OF PP.1 DOES NOT MATCH AS-BUILT. DO YOU HAVE RFI?
01/26/2004 BUILDING PRE-SLAB Partial Approval 1-H prelim on pt slab A) mech embeds need to be removed in several LOCATIONS. b) PROVIDE RFI FOR SHEAR HEAD LOCATED OFF CENTER.
01/23/2004 BUILDING PRE-SLAB Partial Approval 5-D- PRELIMINARY INSP OF PT SLAB
PM-5-D POST TENSION SLAB ZZ.4.5-LINE 7 OK TO PLACE.
01/20/2004 BUILDING PRE-SLAB Partial Approval 1) 5-D CHECK NE CORNER OF PT DECK FOR POSSIBLE SLAB CURD. 2) 1-H EMBEDS FOR MECH HANGERS ARE INTERFERING WITH PT CABLE ELEVATORS. EMBEDS WILL NEED TO BE REMOVED @ COLUMN LINES AS NECESSARE.
01/19/2004 BUILDING PRE-SLAB Partial Approval 5-B PT SLAB OK TO PLACE WHEN SPEC INSP CONFIRM FINAL CHAIRING & CABLE PLACEMENT.(AFTER HOURS INSP)
01/15/2004 BUILDING PRE-SLAB Partial Approval 1) 5-C PT SLAB OK TO PLACE. 2) 5-B PROVIDE RFI FOR CORBEL TOO HIGH @ K/16. 3)4-D SPALLED AREAS MUST BE REPAIRED BEFORE TENSIONING
01/13/2004 BUILDING PRE-SLAB Partial Approval 5-D P.T. SLAB LINE 18- LINE ZZ.4.5 A) IT IS CRITICAL THAT CENTER OF CABLE BE AT CENTER OF GRAVITY FOR CONCRETE @ ENDS. ALONG SW6 CABLE ANCHORS NEED TO BE MOVED TO CENTER OF CONCRETE. OK TO PLACE WHEN CONFIRMED BY SPEC INSP
01/09/2004 BUILDING PRE-SLAB Partial Approval 4-A PT DECK OK TO POUR
PM- P1-J SOG VV.1-XX OK . MECH PADS ON MEZZANINE OK. MECH PAD WEST OF VV.1 LINE OK
01/08/2004 BUILDING PRE-SLAB Partial Approval 1) 4-A a) REINFORCE AROUND PENETRATIONS. b) INSTALL BARS @ RE-ENTRY CORNERS AND OUTSIDE CORNER @ B/14. c) INSTALL EMBEDS FORS TUBE STEEL @ STAIR LANDING. d) INSSTALL SPLAY BARS ON NORTH SIDE OF SW2 AND @ OPENING OF SW3. e) CHECK FINAL CLEARANCES.
01/07/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1-G WHERE'S RFI FOR POP OUTS ON LINE 7?
01/06/2004 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-d pt slab zz.4.5 to line 7 1) chair #4 per 12/203 @ columns. 2) chair #3 hair pins as necessary. 3) ok to place when final chair confirmed by spec insp
01/02/2004 BUILDING PRE-SLAB Partial Approval 1) 1-G PT DECK OK TO POUR. 2) P1-J SOG OFF LINE 24 OK WITH MECH PADS BLOCKED OUT. (AFTER HOURS INSP.)
12/31/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PRE INSPECTION PERFORMED WITH PAUL OF DECK 1-G
12/30/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-J S.O.G. a) MILD REINFORCING OK. b) MECH PADS PER 128 NOT YET FORMED. C) BLOCK OUT COLS PER 117
12/29/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/26/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/24/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-E PT SLAB OK TO POUR WHEN SPEC INSP CONFIRMS FINAL CABLE PLACEMENT AND THE FEW MISSED PERIMETER BARS.
12/23/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-E PT DECK CHAIR STEEL, ADD REINFORCEMENT AND ADD HAIR PINS AS INDICATED, WILL REINSPEC 12/24
12/22/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/19/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-B PT SLAB OK TO POUR.
12/17/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) P1-H S.O.C. CC.1-EE/ 28.4-33.5 A) HAVE SPEC INSP CONFIRM FINAL CHAIRING AN DBLOCK OUT OF DRAIN TROUGH. B) what about cantilever over mech? 2) 4-C PT SLAB OK TO POUR.
12/16/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/15/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-I CLOSURE POURS AT COLS OK TO PLACE.
12/12/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 4-D PT SLAB LINE 18 - LINE ZZ.4.5 PRELININARY STEEL INSP OK. NEED TO DO FINAL INSP FOR PENETRATION REINFORCEMENT AND FINAL CHAIRING OF CABLES & BOTTOM REBAR.
PM- 1) 4-D PT SLAB LINE 18 - ZZ.4.4 OK TO POUR. 2) 1-I,J COMPOSITE DECK FOR MECH MEZZANINE OK TO POUR CONCRETE
12/11/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/08/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-A PT SLAB OK TO PLACE WHEN SPEC INSP COMPLETES FINAL P-T CABLE INSP ( ADDED HAIR PINS).
12/05/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/04/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-D PT SLAB ZZ-4.5 - ZZ.8 AND 7-10.1 OK TO POUR
I HAVE SERIOUS CONCERNS ABOUT THE LACK OF SHOWING FROM LEVEL 2 TO LEVEL 3 IN AREA B, C, D. THE NORMAL CONSTRUCTION ON LEVEL 3 IS INTRODUCING EXTENSIVE POINT LOADS ONTO A DECK THAT IS STILL PARTIALLY "GREEN". PLESAE CONSULT YOUR ENGINEER AND YOUR G.S.N.'S ABOUT CONTINUOUS SHORING DURING CONSTRUCTION. IF ENGINEER OF RECORD IS GOING TO ALLOW ANY DESHORING OR CONSTRUCTION WORK ABOVE DESHORED LEVELS OTHER THAN AS SPECIFIED IN GSN'S, THEN I WOULD LIKE WRITTEN DOCUMENTATION.
12/03/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
12/02/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-H 50G LINE 28.4 - LINE 25 OK TO POUR
AFTER HOURS- P1-G PT SLAB V-Z OK TO PLACE CONCRETE WHEN SPEN INSP CONFIRMS FINAL CHAIRING AT CABLES.
12/01/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
11/26/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
11/25/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AFTER HOURS: 2-E PT SLAB COMPLETE OK TO POUR.
11/21/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-B PT SLAB OK WHEN a) SPEC INSP CONFIRMS PROPER TENDON DRAPE @ BLOCK OUTS. b) PROVIDE RFI FOR CORBEL 1" HIGH.
11/20/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 3-B SLAB INSP DELAYED TILL TOMORROW
11/19/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*1) P1-H DD.1-FF.5 LOADING DOCK SLAB OK TO POUR. 2) 3-D LINES K & LINE 18 THRU ZZ.45 OK TO POUR
11/14/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) 2-A a) COMPLETE DETAIL S @ SW1 & SW2. b)#5 CONT. PER 210 @ SW1. c) USE 208 FOR RE-ENTRY CORNERS @ C/11 & STAIR WAY.d)#5 20' T & 13' B TO EXTEND INTO CLOSURE POUR @14/F.1. e) EXTEND 14' HST & 8' #5 B ALL THE WAY TO SOUTH END AT CLOSURE POUR. f) COMPLETE EXTRA REINFORCEMENT AT PENETRATIONS.
11/13/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
11/12/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*AM 1) 2-D PT SLAB 7-10/U-ZZ.6 OK TO POUR
PM P2-C SLAB ON GRADE 0-0.3 AND INFILL @ ELEVATOR SHAFT OK.
11/11/2003 BUILDING PRE-SLAB Partial Approval 2-D PT SLAB ZZ 6.5/P-U/7-10 A) INSTALL REINFORCEING PER 208 @ ZZ.7/41-42. B) INSTALL PER 208 @ T.5/10 & U/9.5. C) ADD REINFORCING LINE 7 SOUTH SE15 & SW 16
11/10/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM 1) 3-C PT SLAB a) INSTAL SMOOTH DOWELS PER 225 @ SW6. b) ADD SLIP SHEET @ CORNER. c) INSTALL #5 DIAGONALS PER 208 AT REENTRY CORNERS. d) PROVIDE RFI FOR CHANGE TO CAP HEAD. e) 12' #5 HOOK BARS @ ALL POP OUT EDGES. f) #5 CONT PER 210 @ SW7. g) MISSING 1 - 12' #5 LINE L, 21-22. h) ADD 12' #5 HOOK AS NECESSARY ON LINE 22 FOR 12" OC MAX. i) MISSING /35 12' LONG PER S @ SW8. j) DETAIL R SW8, SW9; EXTEND #5'S 6' INTO SLAB. k) 15' #5 REG @0/19. 2) P1-G PT SLAB. a) PROVIDE RFI FOR PENETRATIONS @ CAP HEADS AA/7.1 & 10 AND BB/10. b) SLAB DOWELS PER 210/216 @ SW23 REQUIRED. c) FINISH DETAIL R @ SW23 SOUTHEND.d) SHEAR HEAD @ AA/8. e) FINISH HAIR PINS @ ANCHORS. f) RAISE ALL REINFORCING @ CAP HEADS 3/4" FROM DECK. g) COMPLETE ALL PENETRATION REINFORCEMENT & REENTRY CORNER REINF. h) 12' HOOK BARS 16" OC ALONG SOUTH EDGE. i) BB/9 REQUIRES 2 MORE HOOK BARS. j) DETAIL 210 FOR SE24.
PM 1) 3-C PT SLAB K-O/18-22, OK TO POUR. 2) P1-G PT SLAB Z.2/7.1-10 TO CC.1/30-34 OK TO POUR.
11/07/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1-E SOG P-R/2-7 OK.
11/06/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
11/05/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
11/04/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*1) ESCALATOR PIT 50 D NOT READY. 2) CLOSURE POUR 24/JJ NOT READY
11/03/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) I-D MISSING CLOSURE POUR DOWELLS @ 41.5/ZZ.4.5. 2) 1-D, E HAVE ENG LOOK AT A CRACK IN SLAB FROM CORNER R/6.5 TOWARD 5/7
10/31/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
10/30/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1-A SOG: A) ADD REBAR PER 147 AT WEST END. B) BLOCK OUT FOR COL AT B/15.1 C) MOVE HORIZONTAL ALONG LID 6 TO INSIDE CORNER AT SLAB DOWELS. D) OK TO POUR WHEN SP. INSP. CONFIRMS.
10/29/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) 2-B PT SLAB A) ADD EXPANSION MATERIAL PER 224 @ L/18.2 B) ADD EXTRA #5 REINFORCMENT @ F.1/18.2 FOR UNSUPPORTED CORNER (PER 5. SLONGKER) C) COLUMN HEAD DETAIL 6 CALLS FOR STEEL TO EXTEND INTO CLOSURE POUR. PROVIDE RFI MOVING IT OUT OF CLOSURE POUR OR INSTALL PER PLAN. D) OK TO POUR WHEN SPECIAL INSPECTOR CONFIRMS ITEMS ABOVE. 2) 1-D STAIR 11 A) RECONFIGURE WEST END OF NORTH BEAM FOR EQUEL CLEARANCE BETWEEN BOTTOM BARS. B) PROVIDE PROPER CLEARANCE AT SOUTH END OF WEST BEAM.
10/28/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
10/27/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PM- 1) I-E EXTRA REINFORCING FOR TUB RELOCATE. 2) P2-G SLAB ON GRADE POURED.
10/24/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1-D PT SLAB L-O/14.1-18. a) ADD 1 EACH 12' #5 PARALLED TO SW10 & SW11 PER HEX R. b) ADD 3 EACH 30' #5 AT TOP FRONT OF ELEVATOR SHAFT. c) SHEAR HEAD REQUIRED 16.5/N.5. JOE MUNOZ MAY CONFIRM ABOVE FOR SATURDAY POUR
10/23/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM 1-E PT SLAB R-U/1-7
PM P1-J SOUTH & WEST SLAB SLAB ON DECK OK TO POUR,
10/22/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-J SLAB ON PRECAST. a) PLACE BARS FOR CANT. LEVER ON SOUTH SIDE. b) FINISH PLACING CORD STEEL ON PERIMETER. c) FINISH "Z" BARS FOR DEPRESSED SLAB.
10/20/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
10/17/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
10/16/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) P2-J A) SLAB INFILL AT 35/PP & KK OK. B) SLAB INFILL AT QQ/30 OK WHEN 3 #5 ON EAST SIDE STRAIGHTENED OUT. C) SLAB INFILL ON EAST END OF J REQUIRES 5 #6 ALONG NORTH EDGE AND THE ADDITION OF 1 #6 ON SOUTHEDGE. 2) a) SLAB IN FILL BY ELEVATOR REQIRES CLEAN UP & COMPACTION OF D.G.
10/14/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-G SOG V-AA AND AA/7.1-8 OK
10/13/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
10/10/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*STAIR 19 NOT READY. A)1 BAR DIAMETER SPACING REQUIRED BETWEEN ADJACENT BEAM BARS. B) TOP MOST & BOTTOM MOST MAT BARS ARE REVERSED. C) STIRRUPS NOT COMPLETE.
PM-1) I-A PT SLAB OK I NEED RFI CONCERNING COL HEAD M @ B/14. 20 I-B PT SLAB OK TO POUR. 3) 2,1-D STAIR #9 BEAMS & MATS FOR LANDINGS OK- STEPS NOT YET FORMED OUT. OK TO PLACE CONCRETE.
10/09/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM- I-B PT SLAB REQUIRES MINOR ADJUSTMENTS. CONTR MAKING CORRECTION AT THIS TIME.
PM- 1-B F.1-K/14-18.2 A) MAKE ADJUSTMENTS @ SE CORNER TO BRING HAIR PINS DOWN TO 6 1/4" MAX HEIGHT. B) PROVIDE RFI CONCERNING "FLOATING" SECTION OF SLAB @ F.1/ 18.1.
10/07/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-J QQ-ZZ/27.3-29
10/06/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-I SOG OK
10/03/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-I SOG JJ-QQ/24-29.2
10/02/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 2-C PT SLAB K-0/18-22
09/29/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/1) P1-E SOG R-U/24.1 NOT READY A) DETAIL 102. B) PLBG WRAP. 1) P1-J S.O.D. QQ-XX.5/27.3-32.2-OK
09/26/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/P1-E MILD REINFORCED SLAB AT ELEVATOR OK.
09/25/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-A B-F/13-15.1 OK. 2) P1-I STAIR LANDINGS @ OO * KK OK
09/23/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM- 1) P1-A SOG B-I/13-16 a) FINISH COMPACTING. b) PLACE HORIZONTALS @ TURN DOWNS ALONG LINE 16. 2) P1-H, I GG/24.1-30 TO LL/24-30. a) EXTRA REINFORCEING @ GAPS IN PRECAST REQUIRES BARS T&B. b) "HOOK" BARS NEED TO BE PLACED AT SLAB DEPRESSION. c)"NEW" SLAB DEPRESSIONS AREA H (29-30) NEED TO BE BLOCKED OUT.
PM- P1-H, I 24-30/ GG-LL OK
09/22/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-A,B SOG E-K/13-16. OK TO POUR WHEN SPEC INSP CONFIRMS EPOXY DOWEL PLACEMENT ON LINE K AND FINAL POSITIONING OF WALL TO SLAB DOWELS ALONG LINE16.5
09/17/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/1) P3-J A) FINISH COMPACTION; B) CLEAR AREA AROUND PRECAST COLS; C) NEED TO DIG OUT FOR THICKENED SLAB LINE RR & 31.1;
2) P2-I GG-KK/24-31 EXCLUDING MILD REINFORCED AREA OK TO POUR.
09/15/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM) SLAB ON GRADE ZZ.5-ZZ.8/ 40-43
PM) P3-I OK TO POUR
09/11/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) I-C,D P-T SLAB L/19 TO N/19 NORTH TO ZZ4.5/40-42. 2) P1-D SLAB WITH P-T BEAM T-U/8.1-10.1
(AN AFTER HOUR INSP FEE WILL BE DEDUCTED FROM YOUR ACCOUNT)
09/10/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
09/09/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* LL-QQ/24-30 OK
PM) P2-I 32-35/II.5-JJ.1
09/08/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1_I NOT READY. POUR PUSHED BACK TO THURSDAY.
09/05/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1-D ZZ.4/41.5-42 WITH PT BEAM A OK TO POUR
09/03/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-I JJ-QQ/30-34.9
09/02/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* NOT READY a) STEEL NOT COMPLETE
08/29/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
08/28/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-D S.O.G. ZZ.2-ZZ.4/40-42 OK TO PLACE.
08/25/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* AM P1-I PRELIMINARY INSPECTION OF WELDS JJ-QQ OK. I NEED TO SEE SPEC INSP
PM 1-C PT DECK 18.1-22/K-O OK TO POUR
08/22/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-J QQ-YY/28.5-33 ( LESS BLOCKED OUT AREA FOR STAIR & ELEVATOR) OK TO POUR
08/21/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-I 1) SMOOTH DOWELS IMPROPERLY DURING POUR. AN RFI MAY BE NEEDED FOR REPAIR DEPENDING ON QUANTITY OF IMPROPERLY PLACED DOWELS.
08/20/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) PLEASE PROVIDE COPY OF ENGINEERS RESPONSE TO CRACK IN PT SLAB EXTENDING 2' EAST OF SW6 ON LEVEL 1. 2) progress noted on precast assembly areas I & J COMPLETE WELD REPORTS NOT YET RECIEVED. (Z 95% COMPLETE LEVEL P2 PER AVAILABLE REPORT FROM G. DAVRZIO)
PM- P2-I SLAB PRECAST JJ-QQ/29.8-35 a) SMOOTH DOWELS REQUIRED 16" O C ALONG LINE 29.8
08/19/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P2-D T-U/7.1-10.1 SLAB ON GRADE OK WHEN SPEC INSP CONFIRMS FIBER EXPANSION JOINT AT WALLS AND SLAB DOWELLS @ ELEV.
08/11/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-D P.T. SLAB DETAIL DIDN'T ASSIGN # TO N-S TENDONS. WE WILL CALL EDGE AT SLAB TENDONS SS a,b AND THE NEXT 2 WILL BE SS d,e.
08/07/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-D PT SLAB FROM YESTERDAY'S NOTES COMPLETED & PLACED
08/06/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
08/05/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) P1-D PT SLAB AROUND ELEVATOR AREA NOT READY a) NEWLY DESIGNED DEPRESSED SLAB AREA INCOMPLETE. b) TOP MAT OF #5 12" EACHWAY NOT PLACED. 2) P1-C ASK ENG. ABOUT CABLE 69B IN 1ST PT DECK.
08/01/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) P2 D PRELIMINARY INSP OF STEEL IN SLAB. a) NORTH & SOUTH EDGES INCOMPLETE. b) TOP MAT BY ELEVATORS PITS NOT INSTALLED YET. c) SW12 WILL NEED TO HAVE VERTICAL STEEL INSTALLED BEFORE POUR IN ORDER TO GET COUPLINGS ON. 2) P3, P2,P1-I CONTINUED PROGRESS WITH PRECAST ASSEMBLY
07/31/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
07/29/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* 1) P1-C PT SLAB OK TO POUR. a) STEEL IN DECK OK. CLAM SHELL ADAPTATION INSTEAD OF TOP HAIR PINS AT ? 10 LOCATIONS. (DETAIL 239) OK b) 9 33 STIRRUPS INSTEAD OF 7 #5 STIRRUPS AT SHEAR REINFORCING (SSC3/239) OK'D BY ENG AS ALTERNATE. c) PT CABLING MUST BE APPROVED BY SPECIAL INSP BEFORE POUR.
07/28/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*
07/25/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* P1-C PROGRESS ON PT-SLAB. FINAL INSP TO BE 7/28 PM.
2) P3 I,J PROGRESS ON PRE CAST ASSEMBLY OK.
07/24/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) P1-C AT SW6-SSK114-1A CALLS FOR 3/4" THREADED BOLTS EPOXIED INTO CORBEL THEN PUDDLE WELDED TO BENT PLATE. PLEASE PROVIDE ENGINEER RESPONSE ON POSSIBLE HEAT DAMAGE TO EPOXY
07/16/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) P1-B PT SLAB F-L/16-18 OK TO POUR AFTER FINAL INSPECTION BY SPECIAL INSPECTOR
07/15/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) P2-B SLAB ON GRADE LINE 19 NORTH TO ZZ.1 2) P1-B-PT SLAB ABOUT 80 PERCENT COMPLETE-WILL REQUIRE FINAL INSPECTION
07/03/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000* PI-B I.S-L/14-16
07/02/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) P1-B, F-I.5/14-16 S.O.G. OK
06/27/2003 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection 0000*
06/26/2003 BUILDING PRE-SLAB Partial Approval IVRS - Inspection 0000*/ 1) P2-C, 19-22/L-P