Inspection History Details
Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2004 | STEM WALL/RETAINING WALL | Approved | IVRS - Inspection :* | |
| 12/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* 1) MASONRY WALLS BY LAP POOL AND SPA OK TO GROUT |
|
| 12/16/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/07/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 12/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/24/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/17/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 11/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/25/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/21/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/19/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) PLANTER WALK AT BUS TURNAROUND OK | |
| 10/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/11/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/08/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :WALL EXTENSION @ 4 ELEC ENCLOSURE OK TO CLOSE AND POUR | |
| 10/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 10/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/30/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) PROGRESS ON MASONRY AT PAVILLION OK TO GROUT | |
| 09/27/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) P2-D MASONRY PRE-GROUT OK 2) OK TO PATCH PORT ? COLUMNS-HAVE SPECIAL INSPECTION OBSERVE TO ENSURE THAT PROPER GROUT IS USED PER RFI | |
| 09/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/13/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/1)PI-C WING WALL @ STAIR 3 OK | |
| 09/08/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 09/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :COLUMNS @ PORT COCHERE OK | |
| 08/24/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 08/18/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*P2/I PIERS AT BASE OF BRIDGE COLUMNS OK TO POUR WHEN SPECIAL INSPECTOR CONFIRMS FINAL FORMS | |
| 08/17/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 08/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 08/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/27/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :MONOCOTE REPAIRS REQUIRED AREA I&J @ STEEL COLUMNS AND BEAMS DO NOT COVER WITH ROCK UNTIL I HAVE INSPECTED REPAIRS |
|
| 07/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :P1-G STAIR 19 STEM WALLS OK | |
| 07/21/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/20/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*P1-D BASE FOR STAIR 9 AND 11 OK TO PLACE. | |
| 07/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/06/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 07/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/30/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/29/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) P1-D-BOTTOM OF STAIRS 9 AND 11 OK | |
| 06/25/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) RETAINING WALL AT BLDG "H" | |
| 06/24/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/23/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/22/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/21/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/18/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/17/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/16/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/11/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/08/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/07/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/04/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 06/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/28/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/27/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/25/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/24/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) MASONRY WALL P1-4 OK TO 4' | |
| 05/21/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/20/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) 1-D PART AN CACHERE COLUMNS READY TO CLSOE TO 4'-6' | |
| 05/19/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/18/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/17/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/13/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/11/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/07/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/06/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :*/ 1) GENERAL SITE REVIEW AREAS A-J. ALL PROGRESS OK. CONTRACTOR WILL BE LOOKING FOR TEMP POWER NEXT WEEK | |
| 05/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/04/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 05/03/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 04/30/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 04/29/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 04/28/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 04/23/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
| 04/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* P2-C HYD. SHAFT COL ELEV S1 OK TO CLOSE & POUR. | |
| 04/21/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-D ELEV S2 COLUMN NOT READY | |
| 04/20/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 04/19/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-H RETAIN WALL ADD HORIZ #5 ALONG RAKED TOP. OK TO CLOSE & POUR. | |
| 04/16/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 5-G SW25 & COLS OK TO CLOSE & POUR. | |
| 04/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 04/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-H COLS OK | |
| 04/13/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-H 6 MORE COLS. OK | |
| 04/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-H RETAIN WALL a) PLEASE CONFIRM SK DRAWING FOR BASEMENT WALL IS OK FOR THIS AREA. b) ADD CONTRATION JOINT AT NO MORE THAN 30' APART. | |
| 04/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* GENERAL SITE REVIEW ALL PROGRESS OK. | |
| 04/08/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-4 PLESE HAVE ENG LOOK @ CRACK IN WEST RETAIN WALL. | |
| 04/07/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) BUMP OUT BOTTOM OF FORMS AS NECESSARY. 2) COMPLETE HORIZS ON WEST END. 3) OK TO PLACE WHEN SPEC INSP CONFIRMS | |
| 04/06/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 04/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 7-D PLATE WELDS FOR SCREEN WALL OK | |
| 04/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-G COLUMNS & SHEAR WALLS OK/ SPEC INSP REPORTS OK. 2) NEED TO SEE WELD & EPOXY REPORTS FOR SIGH STEEL PARAPET BEFORE CURBS MAY BE POURED | |
| 04/01/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/29/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-G COLUMNS WEST 1/2 READY TO CLOSE COLUMNS EAST 1/2 NEED SLAB DOWELS COMPLETED. OK TO CLOSE EAST 1/2 COLUMNS WHEN SPEC INSP CONFIRMS | |
| 03/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 03/24/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P3-J MASONRY @ STAIR WELLS PROGRESSING OK. 2) 3-H 16 EACH COL @ EAST END OK | |
| 03/23/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-H REMAINING CCI COLS OK TO CLOSE & POUR | |
| 03/19/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 5-C CURB OK, 5-B CURB OK. 2) 3-G -> SW 23 & 24 CLOSED W/O COT INSP. DO NOT CLOSE FORMS OR COVER WORK W/O COT APPROVAL. SPEC INSP IS ONLY APRT OF THE REQUIREMENT TO CONT WITH WORK. FAILURE TO GET CITY APPROVAL WILL RESULT IN ADDED COSTS. | |
| 03/18/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-G A) COLUMN STEEL REQUIRES RING TIES TO BE PARALLEL TO DECK. ALSO CUT OUT #4 DOG EARS WHERE THEY COME OUT OF FORM. B) SW23, 24- NR a) 1 SIDE 23 FOSR CHECK OF CLEARANCE. b) JAMBS NOT PROPERLY POSITIONED. c) STRAIGHTEN OUT RING TIES. d) REMOVE LOOSE STEEL & PROVIDE PROPER CLEARANCES IN SW 24. | |
| 03/17/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-G SE 25 OK. P1-I,J MASONRY PROGRESS OK | |
| 03/16/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-G A) SW 21 & 22 OK TO CLOSE WHEN FINAL TIES MADE AS DISCUSSED. B) SW23 NEEDS TO BE TIED TO SW 24 EXTENSION. C) INSTALL MECH OPENING IN SW 24. D) HAIRPINS MISSING ON SW 25.2) P1-J MASONRY PROGRESS OK | |
| 03/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-G COLS OK AS INDICATED. 2) NON- STRUCUAL MASONRY PROGRESS AREAS A-E OK | |
| 03/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-G COLUMNS LINES V, W, X, Y EXCEPT V-10, W-9 & Y-9 BOTTOM OF COL OUT OF LAYOUT. PLESE CONFIRM LAYOUT IS CORRECT & MAKE ADJUSTMENTS- DO NOT CLOSE THESE 3. | |
| 03/11/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 03/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-E MASONRY SCREEN WALL OK. 2) 7-D EAST SW'S & COLUMNS OK TO CLOSE & POUR. 3) COLUMNS COMPLETE. | |
| 03/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 2-H COLUMNS LINES CC, DD, EE & FF OK. 2) 1-E MASONRY PROGRESS @ ELEC APD OK. 3) 7-D SW'S & COL'S NOT READY. | |
| 03/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-B,C MASONRY INFILL PROGRESS OK. 2) 7-C SW10 OK. 3) POUR STRIPS OK WHEN SPEC INSP CONFIRMS FINAL PLACEMENT | |
| 03/04/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 03/03/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 03/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 03/01/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 7-D SW 11 & 12 OK COLS WEST OF ZZ.4 OK. 2) 5-E COLUMN STEEL OK, LAY OUT OK. OK TO CLOSE WHEN SPEC INSP CONFIRMS FINAL PLACEMENT. 3) 1-B MASONRY PROGRESS OK. 4) I, J ALL LEVELS MASONRY PROGRESS OK. | |
| 02/27/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P3, P1- I,J | |
| 02/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P3 & P1-I,J MASONRY PROGRESS OK. a) SOLID GROUT AROUND PIPE PENETRATIONS LINE UU FOR PROPER FIRE STOP. 2) 6-D SW13 & SW 16 OK TO CLOSE & POUR. | |
| 02/25/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P3 & P1- I, J MASONRY PROGRESS OK | |
| 02/24/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-J MASONRY LINE UU 4' -8' AFF ADD VERTICALS. 2) P-3-I, J PROGRESS ON MASONRY OK. 3) 6*D SW17 OK, SW 14, 15 NEED TO GO TO LEVEL 8 ( ADD JAMBS) | |
| 02/23/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-I,J MASONRY LINE UU & VV P3-I, J 4' AFF MASONRY | |
| 02/20/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-A RETAINING WALL @ WEST END OK TO CLOSE & POUR. 2) 6-D COLUMNS EAST OF ZZ.4.5 OK TO CLOSE a) COMPLETE SLAB DOWELS AT TOP BEFORE POURING. 3) 2-G SW 23, 24 OK TO CLOSE. 4) P1-I,J MASONRY OK TO GROUT 4' AFF LINE UU.1 & VV | |
| 02/19/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-E SW'S 18, 19, 20 OK TO CLOSE | |
| 02/18/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-I-J MASONRY WALLS YY.1/33, QQ/30 & JJ/30 OK. 2) 2-G A) COLUMNS LINE Z & LINE AA OK. B) SW25 a)ADD CHAIRS. b) OK TO CLOSE WHEN SPEC INSP CONFIRMS. 3) I-H A) PROVIDE ICC/ICBC ES REPORT (OR EQUIVALENT) FOR MECH COUPLERS ON LINE 34 COLUMNS. | |
| 02/17/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 2-G A) SW'S 21, 22 OK TO CLOSE. B) COLS LINES V-Z OK TO CLOSE WHEN SPEC INSP CONFIRMS ADJUSTMENTS INDICATED COLUMNS TO BE 5000 psi 1" AGGREGATE CONCRETE PER RFI 514 DUE TO SHORT LAP SPLICE. | |
| 02/14/2004 | STEM WALL/RETAINING WALL | Partial Approval | 1) E-4 COLUMNS OK TO CLOSE & POUR. 2) 2-G 12 COLUMN WEST END. A) RELOCATE BOTTOMS AS INDICATED. B) RING TIES TO BE HORIZONTAL. C) OK TO CLOSE WHEN SPECIAL INSP CONFIRMS CORRECTIONS. <AFTER HOURS INSP> |
|
| 02/13/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-J MASONRY WALLS TOPPED AT LINES 24, 27, XX. 2) 6-D SW'S 6, 11, 12 OK TO CLOSE. 3) YOU MAY NOT USE PATCH CRTET TO REPAIR COLUMNS. RE-DO REPAIR 6-D ZZ.4/42 | |
| 02/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 6-D REWORKED COLS & SHEAR WALLS (SW6, 11, 12) OK TO CLOSE WHEN SPEC INSP CONFIRMS JAMB SPLICES. 2) P1-J MASONRY TOP OF 8" @ MECH YARD. TOP OF N. 12" AT MECH YARD !!! I HAVE VERY SERIOUS CONCERNS ABOUT LEVEL 1- LEVEL 2 COLUMNS AREA H. DUE TO IMPROPERLY PLACED CONCRETE AT COLUMNS YOU NEED TO RESHORE MORE EXTENSIVELY. I DON'T BELIEVE WORK ABOVE SHOULD CONTINUE UNTIL RESHORED. |
|
| 02/11/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 6-D SWS OK TO POUR | |
| 02/10/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 6-D WHATS GOING ON WITH LEVEL 7-8? PLEASE PROVIDE COMPLETED DRAWINGS SO SW'S MAY BE INSPECTED. | |
| 02/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 6-D A) SW5 a) EXTEND SOUTH JAMB TO FULL HEIGHT. b) ADD SLAB DOWELS @TOP. c) FINISH HAIR PINS. B) SW 10, 11 NOT READY. C) SW6 SHOME HOW WE DROPPED 2 #8 REBAR FROM LEVELS 5-7 @ JAMBS. PLANS CALL FOR 8 #6 BARS, FROM LEVEL 3-5, WE HAVE 8#8 FROM 5-7, 6 #8 PLEASE PROVIDE RFI. D) SW12 a) COMPLETE THE HAIRPINS. | |
| 02/06/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 6-P COLS OK LINES ZZ.3 & ZZ.4, ALSO LINE L & FRONT OF ELEVATOR. 2) P1-J A) 8" MASONRY OK TO 16' WHEN VERTS DROPED IN B) 12" E. WALL OK TO 12' | |
| 02/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-J MASONRY WALLS N & S OK TO 12'. 2) 1-H COLS LINE 31 & LINE 32 OK TO CLOSE FF/33 & FF/34 TIE SPLICES AT BOTTOM. 3) 6-D COLUMNS CAGES OK a)FINISH TIEING SLAB DOWELS @ TOP. b) TIE VERTS SPLICES AT BOTTOM. c) SHAIR STEEL FOSR FORMS. | |
| 02/04/2004 | STEM WALL/RETAINING WALL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/03/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-J MASONRY WALL TO 8' OK. 5-D SW 14, 15, 17 OK TO CLOSE. NOTE:" BECAUSE OF THE VIOLATIONS OF THE BUILDING CODE AND ADMINISTRAIVE CODE CONCERNING OBSERVATION OF CONCRETE PLACEMENT BY A QUALIFIED INDIVIUAL. ALSO BECAUSE OF MY OBSERVATIONS AND THE STATEMENTS MADE BY HARD ROCK CONCRETE CONCERNING IMPROPER PLACEMENT OF CONCRETE.(UBC 1905, ACJ 5.10) THE CITY OF TUCSON WILL NOT BE ABLE TO ACCEPT THE CONCRETE BREAK RESULTS FOR COLUMNS PLACED ON LEVEL 5 AREA D LINES ZZ.5, ZZ.6 & ZZ.7. PLEASE REFER THIS MATTER TO YOUR DESIGN ENG FOR A METHOD OF CONFIRMING ACCEPTABILLITY OF THESE COLUMNS." |
|
| 02/02/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 8" MASONRY WALL OK TO 8'-12" MASONRY @ 6'. SPOKE TO SUB ABOUT FULL HEAD JOINTS. | |
| 01/30/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 5-D EAST COLS OK TO CLOSE AFTER SPEC INSP CONFIRMS MINOR ADJUSTMENTS MADE AS DISCUSSED. 2) 5-D SW 13, 14, 15, 16 OK TO ONE SIDE. SW17 MISSING 1 CORBEL TIE AT EACH END. OK TO ONE SIDE WHEN TIE INSTALLED. 3) P1-I STAIR 25. a) ADD EXPANSION JOINT MATERIAL @ GG.1 RETURN. b) CHAIR AND OR ADJUST STEEL AROUND TOP OF DOOR OPENING FOR MIN 3/4" CLEAR. c) INSTALL DBR'S FOR TREND NOSINGS AND LANDING STEEL. | |
| 01/29/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 01/28/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-E SW18, 19, 20 OK TO CLOSE & POUR. | |
| 01/27/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 01/26/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) | |
| 01/23/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-J MASONRY COUPLERS OK. 2) 5-D SW10 & SW12 OK. 3) 5-B COLS OK TO CLOSE. PM- 5-D SW12 a) ADD HORIZONTAL #5 IN EACH FACE WITHIN 2" OF THESHOLD. b) ADD DBR'S FOR CURB WALL TO "C". c) OK TO CLOSE WHEN SPEC INSP CONFIRMS. |
|
| 01/22/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* SW12 STEEL OK, I NEED TO SEE FORM SET. SW 5 OK & POURED. SW6 NOT READY. 2) 5-B COL CAGE STEEL GENERALLY OK. a) COMPLETE SLAB DOWELS @ TOP. b) ADD CHAIRS @ BOTTOM 1/2. c) FINISH TIES TO LOWER SPLICES. 3) 1-G- SW21 WEST END JAMB NEEDS TO MOVE 3" CLOSER TO FORM | |
| 01/21/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* COLS OK TO CLOSE- HAVE SPEC INSP CONFIRM 2 MISSING CAGES. 5-D CORBEL COLS OK, SW'S NOT READY | |
| 01/20/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 5-D COLS WEST OF CLOSURE POUR OK 2) 5-D SW11 READY TO CLOSE. | |
| 01/16/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* GENERAL SITE REVIEW AND INSP OF COLUMN CAGES. 2) OK TO BEGIN CLOSING COLUMNS LEVEL 5-D WHEN SPEC INSP CONFIRMS CAGE DOWEL TIES. | |
| 01/15/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-D SW13 & SW16 OK TO CLOSE & POUR. 2) 4-A SW1 & SW2 REQUIRE EMBEDS FOR STEEL FRAMING AND CHAIRS. 3) 1-G SW21 OK TO START CLOSING. | |
| 01/13/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-D SW'S 14, 15, 17 READY TO POUR. 2) 4-A COLUMNS OK TO CLOSE & PLACE. | |
| 01/12/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) 4-A SW4 OK TO CLOSE AND POUR 2) 1-G SW23 OK SW24 OK TO CLOSE WHEN SPECIAL INSPECTOR CONFIRMS REWORKING OF EAST JAMB | |
| 01/09/2004 | STEM WALL/RETAINING WALL | Partial Approval | 1) 4-D ALL COLS OK TO CLOSE & POUR. PM- 1-G CLM EXTENSIONS APPROVED OK TO CLOSE COLUMNS. 2) DENIED SW 23& SW24 a) MAKE CORRECTIONS AS DISCUSSED 1/8/04 REF (4) ZS3.03 & 02/S1.02. b) #5 VERTS MISSING @ EAST END OF SW 24 |
|
| 01/08/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-D 14 EACH COLS READY TO CLOSE & POUR. 2) 1-G A) SW25 OK TO CLOSE & POUR. B) SW23 ADJUST HAIR PINS AS DISCUSSED ON N. END- OK TO CLOSE WHEN SPEC INSP VERIFIES. C) SW24 FINISH REINFORCEMENT FOR MECH OPENING. | |
| 01/07/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 01/06/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 01/05/2004 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-C SW7, 8, 9 OK TO POUR | |
| 12/31/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 12/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-B ALL COLS OK TO CLOSE & POUR. 2) 4-C A) SW7 a) ADD 4' #5 BARS AT EACH FACE OF CORNER OF OPENING. b) CHAIR HEADER FOR PARALLEL TO DECK. c) ADD STEEL @ EDGE OF OPENINGS TO PREVENT SPALLING. B) SW6 OK TO CLOSE & POUR. | |
| 12/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-B COLS MAY BE CLOSED/PAVED AFTER SPECIAL INSPECTOR CONFIRMS RINGS RE-TIED PROPERLY | |
| 12/26/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 12/24/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 4-B COLS OK TO CLOSE. | |
| 12/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 4-D SW5 OK, ADD HAIRPIN ON SW12. 2) 4-C COLS OK. 3) COLS A) ADD CHAIRS. B) STRAIGHTEN RINGS. C) TIE OFF BOTTOMS. D) OK TO CLOSE LINES H,I,J. | |
| 12/22/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-J CIP STEMWALL OK. 2) 4-C CCI COLS OK TO CLOSE. 3) 4-D SW1- 7 SW 11 OK TO CLOSE. | |
| 12/19/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 12/18/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-J DISCUSSED LAY OUT OF STEM WALL @ MECH ROOM. OK TO USE MECH COUPLERS ON THE VERTS ALSO OK TO ALIGN COLUMN BLOCK OUT OF SQUARE AT STEM LEVEL TO ALLOW FOR PROPER VERTICAL COVERAGE. 2) 3-A SW3 OK TO CLOSE & POUR. 3) 4-D WEST COLS OK. 2 CORBEL COLS. TO 'B' OK. OK TO CLOSE 2 CORBEL COLS TO 'C' WHEN SPEC INSP CONFIRMS FIANL TIES. | |
| 12/17/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-A SW2 OK TO CLOSE & POUR. 2) 3-A SW3 A) FINISH HAIRPINS NORTH END AND ADD 2 #5 VERTS NEXT TO NORTH JAMB. OK TO CLOSE. | |
| 12/16/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-A a) SW1 OK TO CLOSE. b) SW2 & SW3 NOT READY 2) 4-D a) WEST CCI COL OK TO CLOSE AFTER ADJUSTMENT MADE TO BOTTOM OF 2 INDICATED. b) CORBEL COLS NOT READY. 3) 2-E SW20 ADD HOROZONTAL & HAIR PINS @ TOP TO GET ELEVATION OF 8' 11" FROM TOP OF DECK 2. | |
| 12/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-D SW13a) MATCH & LAP HAIRPINS TO MAT. b) REPLACE 2 EACH HAIRPINS @ SOUTH JAMB-INSTALLED TOO SHORT, NEED 36" PAST JAMB. c)CHAIR BOTTOM OF FORM FOR PROPER CLEARANCE. 2) P1-G SPIRAL STAIR a)INSTALL KEYWAY, SLAB TO WALL DOWELS & VERTICAL DOWELS FOR M ASONRY @ HEADER. b)INSTALL VERTICAL DOWELS FOR MASONRY ENTIRE FORM (24' OC). c) HEADER STEEL TO EXTEND 36" PAST OPENING. PM- 1) 3-D SW13 POURED OK. 2) 3-A SW1, SW2, SW3 NOT READY. 3) 4-D COLS NOT READY. 4) P1-H CCI COLS @ SW26& SW27 OK TO POUR. 5) P1-G WPI @ NW CORNER OK TO POUR, CCI VERTICALS TO BE "WET SET" FOR NEXT LEVEL. 6) P1-G SPIRAL STAIR OK TO POUR. #5 VERTS FOR MASONRY TO BE "WET SET" 24"OC. PLEASE WATCH FOR PROPER SPACING AS MASONRY CELL SPACING WILL"GROW" ON RADIUS LAYOUT. |
|
| 12/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-A SW4 OK TO POUR. 2) 3-D SW16 OK TO CLOSE & POUR. 3) P1-G A) SW27 OK TO CLOSE & POUR B) CIRCULAR STAIR TO LOBBY LEVEL REQUIRE COMPLETETION PER REVISED DETAIL 289 AT HEADER. | |
| 12/11/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-A A) CCI COLS OK TO CLOSE & POUR. B) SW4 NOT READY. 2) 3-D A) SW15 OK TO CLOSE. B) SW16 NOT READY. 3) P1-G SPIRAL STAIR YOU NEED TO PULL IN TOP INSDIE STEEL & ADD MORE CHAIRS. INSUFFCIENT ? LENGHT OF VERTS OUT OF SLAB TO UPPER WALL. (25'-27' -28' REQ PLEASE PROVIDE RFI) | |
| 12/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | 1) 3-D SW 17 OK TO CLOSE WHEN SPEC INSP CONFIRMS JAMB STEEL LOCATED TO ENDS OF WALL. 2) P1-G SW 26 REQUIRES MAT STEEL TO LINE UP WITH FOOTING(LOWER WALL) DOWELS. | |
| 12/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 10 2-E SW 18 OK TO CLOSE. 2) P2-P1/C STAIR #3 OK TO CLOSE WALLS. a) ADD 3 90o HOOKS AT SOUTH SIDE NEAR P1 LEVEL. b) CHECK ALL 90o WALL TO RISER DOWELS ON SOUTH SIDE FOR PROPER ELEVATION. 3) P1-G a) SW21 TIE HAIRPIUNS @ BOTTOM BACK INTO FORM- OK TO CLOSE b) SE26 aa) MISSING SEVERAL 90o X 135o HOOKS @ NORTH END. bb) TIE RINGS BACK FOR PROPER CLEARENCE @ BOTTOM OF SOUTH JAMB. c) SW26 aa) ADD MAT BAR @ BOTTOM. bb) TIE OFF HAIR PINS. cc) FORM OUT COLS ON N & S ENDS.dd) ALIGN EAST MAT VERTICAL WITH FOOTING DOWELS. d) SW27 aa) FINISH SLAB DOWELS @ TOP. bb) FORM OUT FOR CCI COLS ON EAST & WEST6 END. cc) ADD CCI COL STEEL. | |
| 12/08/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-D COLS ZZ4.5 - ZZ.8 OK TO CLOSE & POUR. 2) 2-E SW19 MOVE VERTICAL DOWEL AS INDICATED 8o MATCH REBAR MAT. OK TO CLOSE. | |
| 12/05/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* LOBBY G RETAIN WALL BB.2/7.1 THROUGH CC.1/30 OK TO CLOSE | |
| 12/04/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-G COLS LINES U-Z OK TO CLOSE & POUR EXCEPT V/7.1 | |
| 12/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 2-E COLS (EXCEPT 1 NOTED) OK TO CLOSE | |
| 12/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-G SW23 & SW24 OK TO CLOSE AFTER SPEC INSP CONFIRMS MINOR REPAIRS MADE. | |
| 12/01/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-B COLS OK TO CLOSE & POUR. | |
| 11/26/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-H 5 EACH COLS TAGGED FOR ID | |
| 11/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-D SW10 & SW 11 OK TO CLOSE & POUR. 2) 3-D SW12 ADD #5 TIE AT CENTER BOTTOM OF WEST JAMB. ALIGN HAIR PINS. #) 3-D SW5 COMPLETE CORBEL, ALIGN HAIRPINS AND BUMP OUT BOTTOM OF FORM. AFTER HOURS: 3-D SW12, SW5 OK TO CLOSE & POUR. |
|
| 11/24/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 3-D COLS AT D WEST OK | |
| 11/21/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-H 16" DIA COLS OK TO POUR TO BOTTOM OF P1 SLAB. 2) P-1G STAIR #16 OK TO CLOSE WITH NOTED RESERVATION BY INSP. a)WATER STOP NOT CONTINUOUS (LACK OF HEAT WELDS AT INTERSECTIONS & CORNERS) b) WATER STOP CONTACTS VERTICAL REBAR. c) PLEASE PROVIDE STAMPED SIGNED ENG APPROVAL FOR AS INSTALLED. d) DOWELS THAT TIE TO WATER FEATUR NOT INSTALLED. e) PER KEVIN FROM WEITZ THIS FEATURE MAY BE DELETED. IF FEATURE NOT DELETED THEN RFI FOR REPAIR WILL BE REQUIRED. | |
| 11/20/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1) 2-A PLEASE REPAIR MISALIGNED COL DOWELS @ NW CORNER OF SLAB AS DISCUSSED OR PROVIDE RFI FOR DRILLING SLAB FOR EPOXY SET 2) P1-G SE25 OK TO CLOSE & POUR 3) PLEASE PROVIDE SUBMIITTAL PACKAGE WITH RECOMMENDED INSTALLATION PROCEDURE FOR WATER STOP BEING USED @ STAIR 16 IN P1-G | |
| 11/19/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM- 1) 2-A COLS OK TO CLOSE & POUR (MINUS WEST END) 2) 2-D SHEAR WALLS 13-17 REQUIRE THAT HAIRPINS BE TIED TO MAT STEEL. ALSO CLEAN OFF SLURRY. 3) SW14 OK TO CLOSE & POUR. 4) P1-H SW29 REQUIRES DOWELS PER 214 AT TOP. 5) P1-G HAIRPINS SW25 REQUIRE 3' FROM INSIDE OF JAMB INTO MAT STEEL. 6) STAIR 16 IN P2-P1 G IS NOT READY. PLEASE PROVIDE INFO ABOUT WATER SEAL DOWELS TO LANDINGS/WALLS/ STEPS NOT INSTALLED. PM 1) P1-H SW28 & SW29 OK TO CLOSE & POUR. 2) 2-D SW5 14, 15, 16, 17 OK TO CLOSE & POUR. |
|
| 11/18/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 2-A a) CC2 COL DOWELS @ A/11.5 REQUIRE REALIGNMENT. b)PROVIDE LAYOUT MARKS FOR COL STEEL BEING PLACED. c) SW4 MISSING #5 VERT @ SOUTH END OF MAT 2) 3-C a) SW7, OK TO POUR b) SW8 & SW9 PLAN CALLS FOR 6 #8 IN EACH JAMB, AS BUILT IS 8 #8 PER B/S3.03 OK TO CLOSE & POUR. 3) 2-D a) SW 13, 14, 15, 16, 17 REQUIRE HAIRPINS TO BE TIED TO MAT STEEL. OK TO ONE SIDE ONLY. b) COLS IN AREA 7-10 OK TO PER SPEC INSP REPORT. 4) P1-G a) COLS LINE AA, BB, BB.1, BB.2 OK TO POUR. b) SW24 & SW25 REQUIRE HAIRPINS TIED TO MAT. 5) P2-G a) NEED TO SEE STAIR DETAIL FOR CIP STAIR | |
| 11/14/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 3-C COLS OK TO CLOSE & POUR CORBEL COLS MAY BE APPROVED BY SPEC INSP. 2) 2-D COLS IN AREA 7-10 MAY BE CLOSED & POURED AFTER FINAL INSP BY SCHNIDER & ASSOC. 3) P1-H LINE CC.1 28/29.9 OK TO CLOSE & POUR. | |
| 11/13/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 11/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 11/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 11/07/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 11/06/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-I ESCALATOR PIT & SLAB OK TO POUR | |
| 11/05/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1-A COL @ 13/B OK TO CLOSE & POUR | |
| 11/04/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-I ESCALATOR PIT WALLS OK | |
| 11/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 2-B CORBEL COLUMNS EAST END OK. 2) 1-A COLUMN @ B/13 MUST HAVE 3K PSI CONCRETE CHIPPED OUT OF BOTTOM 7". REQUIRES REINSPECTION. 3) 1-E COL @ Q/6 REQUIRES CONCRETE REPAIRS @ BOTTOM. | |
| 10/31/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-H COLS OK. 2) 1-E COLS @ Q6 & Q5 REQUIRE REPAIR TO CORNERS @ SLAB LEVEL- THIS MAY BE DONE WITH COLUMN POUR. 3) 1-E SW 18, 19, 20 OK TO CLOSE WHEN SPEC INSP CONFIRMS FINAL MAT ADJUSTMENT. 4) 2-B COLS OK TO CLOSE & POUR AFTER FINAL CLEARANCE ADJUSTMENTS. | |
| 10/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) 2-C,D SW 10,11,12, OK. 2) 2-C COLS OK. 3) 1-E COLS OVER SLAB OK. | |
| 10/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* WALLS - 1) 2-C ELEVATOR CAP OK TO POUR. 2) 2-C COLS AS INDICATED. / SLAB - 1) 1-A,E COLS OK TO CLOSE WHEN SP. INSP. CONFIRMS FINAL MINOR ADJUSTMENT. | |
| 10/28/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 2-C SW5 & SW6 OK TO CLOSE. 2) I NEED TO SEE RFI FOR DELETION OF 7 DETAIL 225 (ELIMINATION OF SMOOTH DOWELS @ CORBEL | |
| 10/27/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM- 1) P1-H COLS OK. 2) I-D SE13 JAMBS NEED TO BE CORRECTED. 3) P2-D,E RETAIN WALL OK TO CLOSE & POUR. PM- 1) I-D SW13 OK TO POUR. 2) P1-H COLS OK TO POUR. 3) STEEL IN SW6 OK. |
|
| 10/24/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* SW15 & SW16 OK | |
| 10/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-E SW14 OK TO CLOSE. SW 15 OK TO CLOSE WHEN SPEC INSP CONFIRMS HAIRPINS. 2) 1-D COLS LINE ZZ.6, ZZ.8, J, BY ELEVATOR ON Q/7 OK TO CLOSE & POUR. | |
| 10/22/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-A SW1,2,3 OK TO CLOSE & POUR. 2) 1-D SW 17 CORBEL STIRRUPS TO BE 8" OC OK TO CLOSE WHEN SPEC INSP CONFIRMS. 3) 1-D COLS TO LEVEL 2 OK TO CLOSE AND POUR WHEN SPEC INSP CONFIRMS ENGEERED REPAIR FOR SHORT DOWELS AND FINAL ADJUSTMENT OF CAGES FOR CLEARANCE. | |
| 10/20/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-B SW4 OK TO POUR. 2) 1-A SW1,2,3 NEED VERTS TO LEVEL 2 REWORKED FOR CLEARANCE. WALLS MAY BE CLOSED WHEN REPAIRS MADE AS DISCUSSED. 3) P1-H DD/25.5 TO DD.1/23.9 OK TO CLOSE AND POUR SLAB I-D PT SLAB ZZ4.5 TO ZZ.8 AND LINE 7 OK TO POUR | |
| 10/17/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) INFILL SLABS P3 & P2 I & J OK (EXCEPT STAIR WELL). 2) P1-I BOTTOM OF ESCALATOR PIT OK. | |
| 10/16/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-A 4 EACH COLS OVER PT SLAB OK TO CLOSE. 2) P1-H COL @ CC.3 OK TO CLOSE. | |
| 10/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-H COLS SET TODAY MAY BE CLOSED WHEN STEEL AT TOP REWORKED FOR NEW ELEVATION. THE 24 COLS ALREADY POURED WILL HAVE TO HAVE TOPS REINSPECTED AFTER THEY ARE LOWERED FOR ELEVATION CHANGE. | |
| 10/14/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-H COLS 28/CC.3, DD.1, FF OK CD 27/DD.1 OK COL HH/32, 33 OK. 2) I-B ALL CCI COLS OK. 3) 2-C ALL COLS EXCEPT CORBEL COLUMNS LINE 18 OK. 4) 1-D COL @ CORNER OF SSTAIR LANDING OK. | |
| 10/13/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-B COLS LINES F.1, G, H, I, J STEEL OK. a) H/14.1 NEEDS BOTTOM RAKED OVER FOR PROPER CLEARANCE. b)H/14.1 I & J /14.1 & 15.1 DO NOT HAVE 37" LAP SPLICE, PLEASE PROVIDE RFI ALLOWING 32"-36" ( 30" REQUIRES MIN IN COMPRESSION). 2) 2-C COLS LINES 19, 20, 21, 22 OK TO CLOSE. a) N/20 REQUIRES TIES 6" OC BOTTOM 1/3. b) O/19 NEED BOTTOM RACKED OVER FOR PROPER CLEASRANCE. 3) 2-C SW7, SW8, SW9- STEEL OK. a) NORTH SIDE OF SW7 DOES NOT HAVE PROPER CLEARANCE- DO NOT CLOSE. b) EASTSIDE OF SOUTH JAMB OF SW8 NEEDS MORE CLEARANCE- DO NOT CLOSE. | |
| 10/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P10J COL @ NE CORNER OF COOLER PAD, OK. 2) P2-H RETAIN WALL LINE 34 CC.2-DD. ) ADD 2 #4 AND 90o SLAB DOWELS IN HEADER. b) ADD 2 #5 VERTS @ EASTEND. c)ADD DIAG @ CORNER OF OPENINGS. OK TO CLOSE WHEN SPEC INSP CONFIRMS. 3) P1-D CORBEL COL NORTH OF SW 16 OK. 4) P1-E COL @ U/1 CAGE & LAYOUT OK. a)OK TO CLOSE WHEN SPEC INSP CONFIRMS SPACERS WHEN CAGE STOOD. | |
| 10/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM- P1,I-D 3 COLS ZZ.6,ZZ.7,ZZ.8 PM- P1-J 18" CONE COLS NEAR WW/27.1 5 EACH OK TO CLOSE. 1 COL @ NE CORNER DOES NOT HAVE REQUIRED 2" CLEARANCE TO FORM. |
|
| 10/08/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-G 3 COLS BB.1 BB.2 | |
| 10/07/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 10/06/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-D SHEAR WALLS 13-17 OK AFTER MINOR ADJUSTMENTS. OK TO CLOSE & POUR WHEN SPEC INSP CONFIRMS | |
| 10/04/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-E A) SW13 ADD SPACERS @ SOUTH END OK TO CLOSE & POUR. B) SW14 COMPLETE MAT REINFORCEMENT OK TO CLOSE WHEN SPEC INSP CONFIRMS. C) SW15 CHIP OUT CONCRETE WHERE SLAB WAS POURED OVER D G OK TO CLOSE WHEN SPEC INSP CONFIRMS SUFFICIENT CLEAN UP. D) SW16 OK TO CLOSE & POUR. E) SW17 OK TO CLOSE & POUR. F) CCI COLS (3 EACH) LINE ZZ 8.5 - LINE 8.1 OK TO CLOSE & POUR. | |
| 10/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-D RETAIN WALL NORTH SIDE OF STAIR AREA. 2) P1-E 4 EACH COL OK WHEN SPEC INSP CONFIRMS. | |
| 10/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/1) P2-H CC1AND CC4 COLS. AT II32.1 / 2) P1-H CC4 AT EE5/27.1 | |
| 10/01/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/1) P1-I ELEVATOR SHAFT WALLS OK. 2) P1-D "TALL" COLUMNS OK TO CLOSE WHEN FINAL MINOR ADJUSTMENTS CONFIRMED BY SPECIAL INSPECTOR. RETAIN WALL ZZ2.5 OK TO CLOSE AND POUR. | |
| 09/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-B SW4 DENIED SEE YESTERDAYS NOTES. WALLS: 1) 1-B CORBEL COLUMN AT K/15.1 MOVE CORBEL TIE TO CORNER OF RINGS-OK TO CLOSE 2) P2-6 CC5 COLUMNS SOUTH OF LINE 10 OK, CC1 COLUMNS BB, BB.1 AND BB.2/8.5-OK AND CC1 COLUMNS AT U/10-OK 3) P1-B SW4 OK | |
| 09/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/1) P1-B SW4 NOT READY 2) P2-I PLASTER REPAIR AT JJ/24.1 OK. 3) P1-B SW4 A) MISSING HAIRPINS. B) MISSING HORIZONTAL ON BOTTOM. C) IMPROPER SPACING OF HORIZONTAL AT JAMBS. | |
| 09/26/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/1) P1-E COL AT Q/2 OK TO THICKEN FORM AT BOTTOM TO PROVIDE CLEARANCE - OK TO CLOSE AND POUR. 2) 1-A COLS LINE 11 AND 12 AT C,D,E OK TO CLOSE AND POUR. 3) 1-C,D CERBEL COL AT 0/18 AND OTHER 3 REPAIRED COLUMNS OK TO CLOSE AND POUR. | |
| 09/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-D COL @ ZZ.3/Y3 OK. 2) P1-E COL @ Q/6 1/4 & P.1/7 OK. 3) P1-H DOCK WALL DD.1/25.5-GG/27.1 OK. | |
| 09/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM- P1-E COLUMNS LINE Q/3, 4, 5 PM- 1)I-D COLUMNS LINE42/ZZ.2, ZZ.3, ZZ.4 OK. ALSO TALLERT COLS LINE40 & 41 OK. 2) P1-D 43/ZZ.2 OK. |
|
| 09/22/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-H RETAIN WALL CC.1/29 TO DD/27.1. REMEMBER TO ADD CONTROL JOINT BARS @ CC.1/29 (#4 X 5'-0" 24"O.C.) | |
| 09/17/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/1) 1-C - A) CELS @ L/14.1 AND 15.1 OK. B) SWS, SWG, SW12 OK TO CLOSE. 2) P1-D A) CEL @ 22.8/41 OK. B) STEM WALLS AT FRONT OF ELEVATORS 7.3/P.5 TO U/8.1 OK. | |
| 09/16/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-D COLS LINE ZZ.8/42,43 OK. 2) I-D COLS LINE ZZ.3 & ZZ.4/ 40, 41 OK. LINE ZZ.5/ 40, 41, 42 OK. 3) I-C L/ 14.1 & 15.1 NEED CORBELS ON WEST FACE. COLS M.1/ 17.5 & L.5/ 16.9 OK. COLS LINE 18.1/ N & O OK. SW6 NEEDS VERTICALS RE WORKED. 4) P2-G 7.1/B.2 TO 28.4/CC.1 OK | |
| 09/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM) P1-B LINE13.5/I-K PM) P-1-E COLS LINE 2, 3, 4, 5 & LINE 6/T, U a) ADJUST BOTTOM OF U4 & U5. b) ADD SPACES @ TOPS OF COLS. 2) P1-D COLS LINES ZZ.5, ZZ.6, ZZ.7 OK TO CLOSE & POUR. 3) I-D COLS ZZ.1 & ZZ.2 OK TO CLOSE & POUR. 4) I-D SW 10 & 11 OK TO CLOSE & POUR. |
|
| 09/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-B F.1-J/ LINE 13.5 ADD 1 HORIZONAL EACH FACE AT TOP. OK TO CLOSE. 20 P1-G RETAIN WALL 7.5/BB.2 TO 29.5/CC.1 a) REALIGN #5 VERTICALS IN SECTION INDICATED. b) DRILL & EPOXY 6 MISSING FOOTING DOWELS AT CORNER. OK TO CLOSE WHEN SPEC INSP CONFIRMS PLACEMENT |
|
| 09/11/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 09/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-J HEADER IVER OPENING LINE ZZ. 2) P1-H GG & HH.1 LINE 24 & 25 OK | |
| 09/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-H COLUMNS LINE GG/ 27.1, 28, 29; LINE GG.1/24.1, 25, 27.1, 28, 29; LINE HH.1/27.1, 28, 29; LINE II/24.1, 25,27.1, 28, 29. 2) LINE 29.8/BB.3-CC.2 NEEDS CORNER BARS @ BB.3 | |
| 09/08/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1-D STEM WALL REQUIRES VERTS TO BE MOVED TO CENTER OF WALL. | |
| 09/05/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 09/04/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-B COLS @ F.1/14.1 & 15.1 OK TO CLOSE & POUR. 2) P1-D COLS ZZ.7, ZZ.6, ZZ.5 OK TO CLOSE & POUR | |
| 09/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 09/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2 & G LINE CC.1/28.4-29.5. 2) P1-G LINE CC.1/ 27.2-28.4. 3) P1-B COLS LINE 14.1 & 15.1/G,H,I,J PM-- 1) 1-C SHEAR WALL 7,8,9 OK TO CLOSE WHRN SPECIAL INSP CONFIRMS FINAL ADJUSTMENT OF VERTICALS IN 8 & 9 AND INSTALLATION OF Z15 "C" HOOKS IN 7 ,8 &9. |
|
| 08/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P3-J LINE 27/31-32.2 (HERDER TO LEVEL P3) 2) P1-A,B COL STEEL LINE 15.1 CAGE OK. NO LAYOUT MARKS TO CHECK CONC COVER. 3) P1-A COLS @ B/11 & C/12 OK TO CLOSE & POUR | |
| 08/28/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) 1-C COL @ 0/19 OK TO CLOSE. 2) P2-G CCI COLS LINE Z & AA OK TO POUR. 3) P2-G ELEV PIT WALL SOUTH OF SW25 OK TO CLOSE & POUR. 4) P2-G SW22 A) HAIR PIN @ BOTTOM OF WALL BEING ADDED & REWORK WOUTH JAMB TO GET MIN 1 1/2" CLEAR BETWEEN BUNDLES. B) OK TO CLOSE WHEN REWORK COMPLETE. | |
| 08/27/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* I-C COLUMS LINE 19,20,21,22 OK TO CLOSE EXCEPT 19/0. I WANT TO SEE FIX ON DOWELS OUT OF SLAB. 2) P2-I STAIR WALL NEAR 35/00 OK TO CLOSE & POUR WHEN EPOXY DOWEL INSP COMPLETE. | |
| 08/26/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P2-G SE 27 OK TO CLOSE & POUR. | |
| 08/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* AM- !) P1-D COLUMNS @ ZZ.5/41,41.5,42 ZZ.4/43 ZZ.3/40 OK TO CLOSE & POUR. 2) P1-C COLUMNS @ L/14,14.1,15.1 OK TO CLOSE & POUR. PM 1) P1-I STAIR WELL WALL ABOVE GRADE BEAM NEAR 00/35 (DENIED) A)CORBEL TIES ARE 14" WIDE THEY SHOULD BE 16" FOR 19" WALL WIDTH @ CORBEL. B) USE #5 DIAGONALS, VERTICALS AND HORIZONALS (NOT #4) AS X-TRA REINFORCEMENT AROUND OPENING. C) EPOXY DOWELS INTO EXSISTING WALL ON LINE 35. |
|
| 08/22/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1) P2-I LINE 35/KK WALL OVER GRADE BEAM OK TO CLOSE & POUR. 2) P2-G SW ZZ- DO NOT CLOSE a) HORIZ HAIR PINS @ JAMB- MISSING 1 EACH SIDE 6" UP FROM FOOTING. b) NEED MIN 1 1/2 SPACING OFF FORM AND BETWEEN BUNDLED BARS. c) PLAN DESIGN CHANGE, RF1 152 REQUIRES 20 #11 VERTS THROUGH 1ST 2 LEVELS. ONLY 14 WERE INSTALLED THROUGH LEVEL P1. PM- P1-D A0 COLUMNS LINE ZZ.2/40,41,42,43 B) COLUMS LINE ZZ.3/ 41,41.5,42,43 C) COLUMS LINE ZZ.4/41 & 41.5. OK TO CLOSE & POUR. |
|
| 08/21/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-G STEM WALL AROUND ELEVATOR PIT NEAR Q/X OK TO CLOSE & POUR. 2) P2-I WALLS OVER GRADE BEAM KK/35 a) VERTICALS MISSING @ CORNER. b) 3 VERTICALS NOT PROPERLY PLACED WITH SLAB DOWELS. c) MISSING CORNER BARS(DO NOT CLOSE) | |
| 08/20/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-D LINE 40 RETAIN WALL REQUIRES #4 CTJ DOWELS NEAR ZZ.6. ASK ENG IF HE WANTS THEM EPOXIED IN OR IF SLIP JOINT IS OK. | |
| 08/19/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* P1-D REATAIN WALL LINE 40 TO LINE R a) HORIZ BARS FOR C.T. JOINT NEAR ZZ 6.8 WERE REMOVED AND NEVER REINSTALLED BEFORE LAST POUR. b) C.T. JOINT REQUIRED EVERY 30' MAX- YOU NEED TO ADD ONE BETWEEN ZZ.7 AND ZZ.8. c)CONTINUOUS CORNER BARS MISSING @ R/6.5 PM 1) P2-G SW 23 & SW 24 OK TO CLOSE, PLEASE CLEAN OFF EXCESS SLURRY ON JAMB STEEL AND HAVE SPEC INSP NOTE PLACEMENT OF X-TRA CHAIRS AT NORTH END OF SW23. |
|
| 08/18/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2-H CC4 AT 27/FF.5 OK TO CLOSE AND POUR 2) P1-E COLS AT U/8.3 AND 10 OK 3) P1-A RETAIN WALL LINE A.5 AND LINE 13 TO B STEEL IS OK. CC1 AT B/13 NEEDS TO BE RACKED TO SQUARE AND HAVE CHAIRS INSTALLED. OK TO CLEAR AND POURT RETAINING WALL | |
| 08/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-G a) COLUMNS LINE W & LINE X OK. b) COLUMN @Y/10 AND Z/7.1 OK 2) P1-E LINE R NEEDS CORNER BARS, CT BARS AND SLAB DOWELS. OK TO CLOSE WHEN CONFIRMED BY SPEC INSP. 3) RETURN WALL A.5 & LINE 13 @ WEST END. a)CORNER BARS INCORRECTLY PLACED. b) YOU NEED TO SQUARE UP CCI IF YOU ARE POURING AT SAME TIME. | |
| 08/14/2003 | STEM WALL/RETAINING WALL | Partial Approval | P2-G,H A) SW26 OK TO CLOSE & POUR. B) SW25 BOTTOM OF FORM AT WEST END MUST BE MOVED OUT IN ORDER TO GET 1 1/2" COVER OVER #11 SLAB DOWELS- SPECIAL INSPECTOR MAY CONFIRM BEFORE CLOSING | |
| 08/13/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-C a) SWG OK TO CLOSE & POUR. b) SES OK c) RETAIN WALL ZZ.2/39.1 TO ZZ.3/40 OK TO CLOSE WHEN SPEC INSPECTOR CONFIRMS CORNER BARS. | |
| 08/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-C A) COLS AT 18/N AND O-OK TO CLOSE AND POUR B) SW12 OK TO CLOSE AND POUR C) SW6 REQUIRES DUCT OPENING MODIFICATIONS D) SW5 CALLS FOR DETAIL 225 AT LEVEL 1. WHAT IS CORRECT DETAIL OR RFI ? ALSO WEST SIDE OF SW5 NEEDS TO BE MOVED OUT FOR CLEARANCE 2) P2-H DECK WALL BETWEEN FF-FF/25-27 OK TO CLOSE AND POUR | |
| 08/11/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-D COLS LINE ZZ.2 & M.5/17 & M/16 OK. 2) P1-D SE6 STEEL OK-WHERE WILL DUCT OPENING BE MADE? 3) P2-H DOUBLE CORBEL COLS LINE 27 & LINE 25 OK TO POUR COLS24/HH.1 & II.1 OK TO POUR. 4) LOADING DOCK WALL FF.8/25-27 REQUIRES SLAB DOWELLS PER DETAIL 141 @ TOP AND CORNER BARS @ SOUTH END. | |
| 08/08/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* ) P1-D a) SW 10 OK TO CLOSE. b) COLUMS @ 18/N,O & M.S / 15 OK. MAKE CORRECTIONS TO OTHER COLUMNS & WALLS AS NOTED ON TICKET ON STEAL 2) P2-H a) COLUMNS @ GG.1 / 28 & 28.4 OK TO POUR. b) COLUMNS @ HH.1 /28 & 28.4 OK TO CLOSE POUR AFTER #3 CLOSED TIES READJUSTED 3)LINE 24 CC4 COLUMNS OK TO CLOSE & POUR. b) OTHER DOUBLE CORBEL COLUMNS OTHER THAN THOSE LISTED IN 2 ABOVE REQUIRE #3 CLOSED TIES @CORBEL. 4) GRADE BEAM COLUMNS WEST OF JJ BETWEEN 34 & 35 ARE 0K. |
|
| 08/07/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-D ELEV PIT SOUTH OF SW14 OK TO CLOSE & POUR. 2) NEED SPACERS AT TOP OF JAMBS SW8 & SE9 - OK TO POUR | |
| 08/06/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 08/05/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-H SW30 OK TO CLOSE (WITH RETURN & PILASTER) 2) P1-C COL @ 22/L OK TO CLOSE & POUR. 3)P1-C SW7 CLOSED & READY TO POUR. 4) P1-C SW8 NOT READY a) MISSING HORIZ HAIRPINS. b)THE 14 #11 VENTS FOR SW TO NEXT LEVEL REQUIRE PROPER SPACING & PLACEMENT. | |
| 08/05/2003 | STEM WALL/RETAINING WALL | Partial Approval | PM 1) P2-H SW30 a) TOP HORIZ MUST BE INSIDE CORNER OF EMBEDS. b) YOUR SLAB DOWELS APPEAR TO BE TOO HIGH- PLEASE DOUBLE CHECK DEPTH OF PRECAST WITH SLAB ON TOP. 2) P2-H LINE 24.1/GG-IJ PER 311 & 347. a) 2ND #8 FROM BOTTOM NORTH SIDE NEEDS TO BE PULLED OVER AS CLOSE TO FACE (1 1/2 CLEAR) AS POSSIBLE. b) INSTALL EMBEDS FOR DOUBLE T PRECAST PER T-PAC | |
| 08/01/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P1-C CCI COLS LINES 19,20,21 OK TO CLOSE & POUR. SW7 OK TO CLOSE & POUR. | |
| 07/31/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 07/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-P1,J - LINE XX/25.1-27.1 OK TO POUR. 2)P2-I ISOLATED CORBEL @ QQ/25 OK TP CLOSE & POUR | |
| 07/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* SERVICE ELEVATOR WALLS Q-R/7.1-7.2 OK TO CLOSE AND POUR AFTER EPOXYED DOWEL INSP IS APPROVED. | |
| 07/28/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P3-J COL @ II.3/33.1 NOT READY a)EPOXY IN MISPLACED DOWELS. b) CUT OFF EXSISTING DOWELS OUTSIDE OF FORM. 2) P2-H CCI COL @ 32/II OK TO POUT. 3) LINE GG ISOLATED CORBELS NOT READY a) MISSING #6 HORIZONAL WITH STANDARD HOOKS. b) BOTTOM FRONT AT CORBEL. | |
| 07/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2-J CAP WALL LINE XX/26-27.3 OK TO CLOSE & POUR. A) OFF SET OF MASONRY PLIASTER DOWELS THRONGS CIP WALL OK. | |
| 07/24/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2-I LINE 24.1/II-II.2-OK TO CLOSE AND POUR AFTER AB'S SET | |
| 07/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2-H LINE 31/GG-II.2 CLOSED AND POURED 2) P3-J CC1 AT 33/II A) HOOP TIES AT TOP AND BOTTOM NEED ADJUSTMENT B) EPOXY NEW DOWELS TO FOOTER AND CUT OFF OLD DOWELS OUTSIDE OF COLUMN | |
| 07/22/2003 | STEM WALL/RETAINING WALL | Partial Approval | 1) P3-I 16 X 16 COLUMNS AT 35.1/00.5 AND KK.5 OK TO CLOSE AND POUR 2) P2-D LINE 43/Z.7 TO LINE T/8.1 A) NEED TO EPOXY DOWELS AT 45 DEGREE ANGLE AT 10 B) COMPLETE CONTINOUS HORIZONTAL REINFORCEMENT AT 8 C) MAKE SURE #5 VERTS ON LINE 43 ARE WITHIN 5" OF SLAB DOWELS D) OK TO CLOSE WHEN FINAL PLACEMENT CONFIRMED BY SPECIAL INSPECTOR | |
| 07/21/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P3, I, J 16" X 16" COLUMNS AT 00.5 AND KK.5 DO NOT POUR. A) VERTICALS IN FORM ARE TWISTED AND DO NOT HAVE PROPER CLEARANCE FROM FORM 2) P2, J LINE 24.1/QQ.1-RR OK. A) COLUMN AT QQ HAS VERTS. AGAINST FORM. CONTRACTOR IS GOING TO REFORM 4" WIDER TO GET PROPER CLEARANCE AND SIZE FOR BRACED COLUMN 3) P2, D, E-ELEVATOR SHAT WALL LINE 41 FROM ZZ.8 TO SW14 OK TO CLOSE AND POUR | |
| 07/18/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2-H LINE GG/24-26 A) INSTALL TOP BAR IN EMBEDS B) INSTALL BLOCK OUTS FOR ISOLATED CORBELS 2) P2-D SOUTH ELEVATOR PIT WALL NEAR ZZ.8 OK TO CLOSE 3) P1-B COLUMN STEEL LINE 17 AND LINE 18 OK TO CLOSE AND POUR | |
| 07/17/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2-H: (A) LINE GG/25-27 STEEL OK. (B) LINE 31/GG-HH.1 OK TO POUR. (C) LINE 31/HH.1-II LOW SECTION OK TO POUR. 2) P2-G LINE 7.1/X-Z OK TO CLOSE AND POUR. 3) P1-E RETAIN "WING WALL" LINES S & U OK TO CLOSE AND POUR. 4) P2-P1,J LINE 24.1/QQ-RR OK TO CLOSE. | |
| 07/16/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) YOU NEED TO PATCH HONEY COMBED AREA OF WALL AT P3-J 33.1/JJ 2) P1-A LINE 13/L-E HIGH AREA OK TO CLOSE AND POUR 3) P1-A LINE 13/E-F.5 LOW AREA OK TO CLOSE AND POUR 4) P1-A SW2 AND STAIRWALL ON LINE B OK TO CLOSE AND POUR | |
| 07/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P3-I LINE JJ.2 OK TO CLOSE WHEN SPECIAL INSPECTOR CONFIRMS FINAL PLACEMENT OF CORBEL NEAR LINE 32 2) P2-H COLUMN AT II/30 STEEL OK, OK TO CLOSE. AB'S FOR PRECAST NOT YET PLACED IN TOP 3) P2-H LINE 31/GG-HH.1 A) TOP BAR MUST BE IN EMBEDS B) CORBEL STEEL MUST BE FULLY PLACED IN CORBEL FORM C) COLUMN AT HH NEEDS TO BE ROCKED TO SQUARE 4) P2-D,E SW14 A) #14 TO #11 SWAG COUPLINGS COMPLETE B) CRACKED COUPLES CUT OUT AND REPLACE C) MINOR ADJUSTMENTS NECESSARY ON #4 RING TIES NEAR COUPLERS AT NORTH JAMS D) THREADED REBAR CONNECTORS NEED TO BE PLACED FOR SHAFT RETURN WALLS 5) P2-G-SW21 OK TO POUR | |
| 07/11/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) INSTALLATION OF SWAG CONNECTORS AT SW14 IS NEAR COMPLETE. ONE CONNECTOR HAS CRACKED AND WILL REQUIRE SUITABLE REPAIR | |
| 07/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P3-I, II.2/32.2-33.1 STILL NEEDS FORM SPACERS AND BLOCK OUT FOR DOOR WAY AT P2 LEVEL 2) P2-H LINE 30/HH.1-JJ.2 A) CORNER BARS AT II.2 INSTALLED WRONG-BEING CORRECTED AT THIS TIME B) VERTICAL JAMB BARS FOR SW28 AT II.1 NEED TO BE RACKED INTO PROPER POSITION AND TIED. C) OK TO CLOSE WHEN SPECIAL INSPECTOR CONFIRMS ADJUSTMENTS MADE 3) P2-G, LINE 7.1/V-X OK TO CLOSE AND POUR 4) P2-I, ISOLATED CORBELS AT 24.1/PP AND KK OK TO CLOSE UP. AB'S TO BE INSTALLED BEFORE POUR | |
| 07/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*(1) 1-E STEM NOT READY. (2) 1-D PORT COCHERE COLS OK. (3) P2-P1/H STAIR 33 NOT READY. | |
| 07/08/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) P2 LINE 7.1 /V-W NEEDS ?? BARS @ EACH END. 2) PI-E, SW19, SW 20 AND CONNECTING WALL ??? OK TO CLOSE & POUR | |
| 07/07/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) CORNER AT 11/24.1 STILL NEED AB'S PER DETAIL 362. OK TO CLOSE AND SET AB'S | |
| 07/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* PI-E SW18 PLEASE GET # 11 VERTS PLACED IN CORNERS OF TIES AND COMPLETE WALL CONNETION @ WEST END OK TO CLOSE WHEN SPECIAL INSPECTOR CONFIRMS. | |
| 07/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-A, SW2 OK TO CLOSE AND POUR | |
| 07/01/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-D, LINE 40 COLUMNS AT ZZ.3, 4, 5 AND 6 OK TO CLOSE AND POUR 2) P2-J, MECHANICAL SHAFT WALLS LINE 24.1 AT KK AND PP OK TO CLOSE AND POUR 3) P2-H, LINE G1, TOP OF STEEL REINFOREMENT IMPROPERLY PLACED AROUND EMBEDS A) REPARIS MADE ? OK TO POUR 4) P1-A-SW2 REQUIRES 2" CLEAR BETWEEN VERTICALS AT WEST END 5) P2-D-ELEVATOR SHAFT RETAIN WALL TO SLAB OK TO POUR | |
| 06/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-D, COL STEEL LINE 40 IN PROGRESS 2) P2-G, LINE GG/?/.31 REQUIRES CORNER BARS AT 31 AND REQUIRES EMBEDS EPR DETAIL 319 AND RFI 23 ? 3) PROGRESS ON CAISSONS P3 I-J OK | |
| 06/27/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-D,E LINE R STEP DOWN WALL FROM 5-6 2) P2-B, COLUMNS AT M14, N15 AND O16 3) DOOR BUCK LEVEL P2 LINE 331 II.2-II.1 OK | |
| 06/26/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*P1-D, LINE 40 STEP DOWN FROM ZZ-5.5 | |
| 06/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P1-A, SW3 OK TO CLOSE AND POUR 2) P1-D,E; LINE R/2-5.5 A) SLAB DOWELS AT TOP OF WALL NOT YET INSTALLED OK TO CLOSE WHEN SPECIAL INSPECTION OBSERVE DOWELS IN PLACE 3) P2-J, MECH WELL AT 24.1/PP.5 OK TO CLOSE WHEN SPECIAL INSPECTOR FINISHES EPOXY DOWEL INSPECTION 4) CORNER AT QQ/27.3 OK AFTER TOP BAR PLACED 5) P2-J, LINE 27.3/XX-YY OK TO CLOSE AND POUR 6) P3-I, LINE 35/PP-QQ AND LINE 35 JJ-KK OK TO CLOSE AND POUR 7) P3-I, LINE 33.1/II, 2-JJ OK TO CLOSE AND POUR 8) P3-I, LINE 34.1/HH-II OK TO CLOSE AND POUR | |
| 06/24/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) P2, BLDG J MECH WELL AT QQ/24.1 OK TO CLOSE AFTER SPECIAL INSPECTOR OBSERVES PROPER EPOXY PLACEMENT OF RELOCATED FOOTING DOWELS 2) P2, BLDG J LINE 27.3/XX-YY OK TO CLOSE A) AB'S REQUIRED TOP OF WP1 AT XX B) YY-ZZ ON SAME LINE REQUIRED 1/4", FEET SLOPE ON CORBEL PER TPAC DESIGN 3) P2, BLDG D, LINEE ZZ2.5/40-41 OK TO CLOSE AFTER SPEC INSPECTION OBSERVES FINAL PLACEMENT OF HORIZONTAL DOWELS TO EMBEDS ON LINE 40 | |
| 06/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) ISOLATED CORBELS REQUIRE ONE #6 CROSS BAR WELDED TO TENSION BARS. PER VERBAL WITH STEVE SLONKER OTHER HORIZONTALS MAY BE #5 | |
| 06/20/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1) LEVEL P3 AREA I SW29 OK TO POUR 2) BLD D TO BLD B LINE 13 OK TO CLOSE UP WHEN SPECIAL INSPECTOR CONFIRMS FINAL ADJUSTMENT AND EXPANSION JOINT INSTALL 3) BLD B LEVEL P2 COLUMNS ON ?17-?18 OK TO CLOSE UP | |
| 06/19/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 06/18/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LEVEL P2 AREA B COLS AT J17, J18 STEEL OK 2) LEVEL P3 AREA H SW29 REQUIRE ADJUSTMENT FOR PROPER CLEARANCE BETWEEN #11 BARS. OK TO BOTTOM UP WHEN SPECIAL INSPECTION OR MYSELF OBSERVE CORRECTIONS | |
| 06/13/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/LEVEL P2/P1 AREA B RETAINING WALL A/ON ZZ2.5 IN GENERAL COMPLIANCE. WALL STEEL CURRENTLY BEING CUT TO LOWER ELEVATION. OK TO CLOSE UP WALL AFTER SPECIAL INSPECTOR CONFIRMS ANY STEEL "KNOCKEDOUT" AT PLACE HAS BEEN CORRECTED. 2) AREA J LEVEL P3 LINE 35/NN-00 OK TO CLOSE WHEN FINAL, MINOR ADJUSTMENTS MADE |
|
| 06/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) CC 3 AND CC 5 COLUMNS LEVEL P2 AREA B AND C OK 2) LINE 27.3/WW-XX AND PILASTER AT TT OK 3) BLDG J LINE 33.1 ISOLATED CORBELS HAVE BEEN FORMED OUT TO 24", DETAIL CALLS FOR 18"-PLEASE SET RFI | |
| 06/11/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ WALLS: 1) LINE 27.3 AT TT REQUIRES AB'S PER 363 AND MOVE TOP HORIZONTAL STEEL INSIDE EMBEDS 2) LEVEL P3 LINE 35/LL-NN OK TO CLOSE 4' POUR 3) AREA D EXTENSION ON SW15 OK | |
| 06/10/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) SW13 LEVEL P2 OK TO POUR 2) LEVEL P2, AREA B AND C, COLUMN STEEL OK , I WANT TO SEE WHEN FORMS ARE PLACED TO ENSURE PROPER CLEARANCE AT BOTTOM | |
| 06/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) SW29 OK TO CLOSE AND POUR | |
| 06/06/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) SW 15 AND 16 LVEVEL P2 OK TO CLOSE UP 2) SW29 LEVEL P3 NEED CENTER VERTS TO BE SPREAD APART AS FAR AS POOSIBLE. ALSO CLEAN OFF SLURRY. DO NOT CLOSE UP UNTIL RE-INSPECTED | |
| 06/04/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) CORBEL PLACEMENT OK IN PILASTER AT QQ 27.1 2) LEVEL P3, JOG AROUND STAIRWELL IN II/32.5 AREA OK 3) AREA B LEVEL P2, CC1 COLUMNS LINE P, LINE N AND K/20 AND M/20 4) AREA I LEVEL P3 LINING/33.1-35 OK TO POUR 5) ELEVATOR SHAFT ENCLOSURE AT II.S/32.5 OK TO CLOSE UP 6) AREA J, LEVEL P2 LINE 27.3/JV.1-WW.5-SPECIAL INSPECTOR TO CONFIRM AB'S AT BRACED COLUMN | |
| 06/03/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LEVE P2, LINE 27.3/VV-WW A) NEED PROPER COVER (CLEARANCE) AT PILASTER B) INSTALL #4 JOINT BARS AT C.D. 2) SW11 OK 3) LEVEL P2, LINE K/14-15.1 | |
| 06/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) AREA "B", LEVEL P2 LINE 14/K-M 2) CC1 REPAIR AN LINE L/14-1 STILLNEDS INSPECTION 3) ARE I, LEVEL P3, LINE 35, KK-LL OK 4) LINE JJ/33.1-35 OK | |
| 05/30/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 05/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LEVEL P3 LINE 27.3/QQ-TT 2) LEVEL P3 LINE 33.1/II.2-JJ 3) LEVEL P3 LINE II.2/31.1-33.1 STEEL OK, MISSING EMBEDS LEVEL PL | |
| 05/28/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LEVEL PL STEEL FROM QQ/26 TO UU/27.3 90 PERCENT DONE A) INSTALL CORNER BARS AT QQ/27.3 B) RELOCATE CJ BEHIND PILASTER AT QQ27.1 TO THE NORTH C) INSTALL A C.D. NEAR RR/27.3 (BUT NOT BEHIND PILASTER | |
| 05/27/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LINE 273/QQ-RR REQUIRES CORBEL TIES TO BE RE-WORKED FOR PROPER PLACEMENT | |
| 05/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*/ 1) LEVEL P3, LINE 31.1/II.1-JJ OK 2) LEVEL P3, LINE 33.1/QQ.5-RELOCATION OF OPENING TO P2 LEVEL OK 3) LEVEL P3, LINE QQ/34.5-34.9-STILL NEED TOP SLOPE 4) LEVEL P3, LINE II.2/31.1-32.1 LOWER 4' FOR BUILD UP OK 5) LEVEL P2, LINE QQ/24.1-26 OK 6) LEVEL P2, LINE F/16-18 OK 7) SW4 LEVEL P2 OK 8) SW10 LEVEL P2 OK 9) NOT READY LINE 16.5/J.5-L: A) MISSING 2 FOOTING DOWELS EAST END B) VERTICALS WEST END NOT PLACED OR TIED C) CLEAN SLURRY OFF VERTICAL DOWELS | |
| 05/21/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*LEVEL P2, LINE 16.5 H-J.S OK & ALREADY POURED 2.) LEVEL P2, LINE K.5 F-H REQUIRES THAT #6 BAR USED FOR BRACING STEEL BETWEEN G & H BE REMOVED. 3.) LEVEL P2, LINE 24.1 LL-00 OK & ALREADY POURED. 4.) LEVEL P2, CCL COLS @ 17 L.5 17/M.5 5.) LEVEL P2, LINE 24.1/00=QQ. |
|
| 05/20/2003 | STEM WALL/RETAINING WALL | Partial Approval | 1) SHEAR WALL 6 OK TO DOUBLE UP AND POUR S2.01 GRID 18, L.M. | |
| 05/16/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1.) Level P2, SW5 @ L/17.5 2.) Level P2, WING I LINE 24.1/II.1 KK.S |
|
| 05/15/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* | |
| 05/14/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*WING B, LEVEL P2 SW 12 OK. | |
| 05/13/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1.) WING J, LEVEL P3 LINE ZZ/32.2-33.1. 2.) WING J, LEVEL P3 LINE QQ/33.1-34.5 3.) WING B, LEVEL P2 LINE L/15.5 16.5 PER SK DATED 4-21-03. 4.) WING B, SW 12 #14 BARS @ TOP OF FORM ALONG NORTH FACE MUST BE PULLED INTO ALIGNMENT PER ENGINEER DETAIL. TO PULLED INTO ALIGNMENT PER ENGINEER DETAIL TO PROVIDE MIN 1 3/4" BETWEEN ADJACENT BARS. OK TO POUR WHEN SPECIAL INSP VERIFIES IN AM OF 5-14. |
|
| 05/12/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*SECTION OF WALL @ P2 LEVEL OF J BLD HAS INCORRECT SIZE RING TIES FOR CORBEL. ALSO OPENING PLACED TO HIGH. MARK OF WEITZ CONST. IS HAVING ALL STEEL PULL OUT AND REPLACED WITH CORRECT. 2.) MET WITH SPECIAL INSP. FIELD SUPERVIOSR AND STEEL FOREMAN TO GO OVER HAT WILL BE NECESSARY @ SHEAR WALLS WHERE 24 #12 VERTS OR 20 #14 VERTS ARE SPLICED PER ACI. 3.) REINSPECTION PM A.) LEVEL P3 LINE 33.1/QQ.S RR & QQ-QQ-1 B.) LEVEL P3, LINE 33.1 OFFSET @ YY C.) LEVEL P3 LINE 22/32.2 33.1 TIES @ 33.1 AND EMBEDS NEED TO BE PLACED. D.) LEVEL P2 CC1 @ M 162 & 17.5. |
|
| 05/09/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*LEVEL P3 LINE 33.1 TT-UU. | |
| 05/07/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1.) LEVEL P3 LINE 33.1/YY-ZZ AND 33.1/55.T-UU 2.) NEED ENGINEER TO INSPECT COMBING WHERE REBAR EXPOSED VENT OPENING AND BOTTOM OF W PI'S ON LINE 33.1. |
|
| 05/06/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000* 1.) LEVEL P3-P1 LINE 33.1 FROM UU.05 TO WW OK 2.) TOP 12" OF CONCRETE PLACED @ LINE JJ LEVEL P3 WHERE SHORT POURED ON 5-3-03. 3.) LEVEL P3, LINE 33.1 YY-ZZ CORBELS MUST BE POSITIONED TO MAINTAI 1" CLEAR FROM FORM ON ALL SIDES & EMBEDS MUST BE PLACED. |
|
| 05/02/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1.) LEVEL P3-P VV.1 XX.9 OK TO POUR. 2.) PLEASE PROVIDE SEALED RFI FOR CONDITION @ NEAR CORBEL 3.) PLEASE PROVIDE SEALED RFI FOR NOTE 6 DETAIL 25/51.03 I.E. REPLACE WORDING "JAMB BARS SHALL EXTEND FULL HEIGHT OF WALL" WITH "JAMB BARS SHALL BE CONTINUOUS THRU LEVEL". |
|
| 05/01/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*AREA I.J. 22 31.1 TO LL 29.2 RETAIN WALL P3 TO P2. | |
| 04/29/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*KORBEL STEEL PP-QQ/29.2 NEED TO BE RELOCATED Z1" FOR PROPER FORM CLEARANCE. FINAL CLEARANCE TO BE OBSERVED BY SPECIAL INSPECTOR. 2.) STEEL IN SW7, SW8 & SW9 IN AREA B IS OK. I HAVE CONCERNS ABOUT MAINTAINING THE 1 1/2" CLEARANCE WHERE STEEL HAS BOWED IN FROM FORM. PLEASE INSTALL WIRE TIRES AS NECESSARY. |
|
| 04/25/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*1.) LEVEL P3 28.2 TO 31.1 LINE YY.1. 2.) LEVEL P2 BLD B SHEAR WALL 7, 8 & 9 OK TO 9' ABOVE FOOTINGS. |
|
| 04/23/2003 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection 0000*RETAIN WALL LINE 29.2/LL-NN LEVEL D3. |