Permit: T02CM05318

Parcel: 11628001E

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
11/12/2004 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
11/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) FOOTINGS AT PAVILLION AND POOL AREAS OK
2) ADD CORNER BAR AT P2-C WALL FOOTING FOR CONTINOUS AT S.E. CORNER
11/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
11/03/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/P1-4 WING WALL @ BUS TURNAROUND FOOTING OK
11/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
11/01/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/27/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/25/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/22/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/21/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/FOOTING @ DRAINAGE DITCH NORTH OF I OK
10/13/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*/FOOTING CI SERVICE ROAD IS NOT READY
10/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/11/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/05/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) WING FOOTINGS AT OUTDOOR EXPANSION OK
09/27/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) STAIR 16 REPLACEMENT FOOTING OK 2) PAVILLION FOOTINGS AT D OK 3) POOL EPUIPMENT HOUSE FOTOING OK
09/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/1)LOWER RETAIN WALL FOOTING @ ACTIVITY POOL OK 2)FOOTINGS @ POOL EQUIP ROOM OK
01010-1)MASONRY PROGRESS @ PAVILLION OK
09/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/08/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :LOWER PAVILLION FOOTING OK TO PLACE WHEN SP. INSP CONFIRMS Z BARS
09/01/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/31/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/30/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/25/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
08/24/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*/DENIED 1) LOWER RETAIN WALL @ ADULT POOL INCORRECT LAP SPLICES, INCOMPLETE CONTINUOUS FOOTINSS 2) FOOTING (QUAD) AT SHADE BAUILLION? OK
01010-PARTIAL-1ST LIFT MASONRY @ LOWER RETAIN (SOUTH 1/2)
01015-NOT READY-STAIR 33 INCOMPLETE
08/16/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) 1-G POPOUTS OK
08/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
08/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*AREA D; (1) APPROX 60' MORE AT FOOTING @ SHADE PAVILLION OK. (2) LOWER RETAINING WALL FOOTING @ POOL OK.
08/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/30/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*P2-P1/0 FOOTINGS FOR SHADE STRUT OK
07/22/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/20/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/29/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/24/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
06/23/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
06/22/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
06/21/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
06/18/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/17/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/16/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW
06/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/11/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) P1-H RETAIN FOOTING AT CURCVE OK
06/08/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/07/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* GENERAL SITE REVIEW PROGRESS OK
06/04/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* FOOTINGS ON SLAB STAIR 10 OK
06/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/01/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* GENERAL SITE REVIEW AREAS G-J
05/28/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW G-J
05/27/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW AREAS A-C
05/25/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/24/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/21/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/20/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/19/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW D-J PROGRESS OK
05/18/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW, NO EXCEPTIONS NOTED
05/17/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/11/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/07/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*/ 1) GENERAL SITE REVIEW AREAS A-E PROGRESS OK
05/06/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/05/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/04/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
05/03/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
04/30/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* GENERAL SITE REVIEW WINGS A-E. ALL PROGRESS OK, NO DEFIECIES NOTED.
04/29/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* GENERAL SITE REVIEW ALL PROGRESS OK, NO DEFIECIES NOTED.
04/28/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* GENERAL SITE REVIEW ALL PROGRESS OK, NO DEFIECIES NOTED.
04/23/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* MASONRY CURBS OK TO PLACE & GROUT
04/22/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* P1-D ELEVATOR PAD 53. A) CHAIR REBAR OK TO POUR.
04/21/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/20/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/19/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/16/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-C FOOTING @ ELEVATOR S2 OK. 2) P2-P1-C STAIR 3 NOT READY. a) FORMS FOR STEPS MISSING. b) FOOTING @ BASE (DETAIL 150) MISSING.
04/14/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) 1-A F-12 FOOTING N SIDE OK.2) 1-E F-12 FOOTINGS W SIDE OK. 3) P1-H RETAIN FOOTING PER RPI OK.
04/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-A F-12 FOOTINGS LINE 16.2 N/R. 2) P1-E F-12 FOOTINGS LINE 4.2 N/R. #) P1-H RETAINING FOOTING NEEDS VERTS INSTALLED AND TO HAVE FORMS PARALLE @ 5' WIDE. THERE IS SOME DEBATE AS TO INTERPRETATION OF FOOTING TABLE 132, PLEASE CLARIFY WITH ENG.
04/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/08/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/07/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/06/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* GENERAL SITE REVIEW. PROGRESS ALL AREAS OK. NO DEFIENCIES NOTED AT THIS TIME.
04/05/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
04/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2-H RETAM FOOTING OK EXCEPT A) REMOVE WOOD DEBRES.
04/01/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :
See detailed listing on site.| 999*
03/29/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/24/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/23/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/19/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* AFTER HOURS INSP.
03/18/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/17/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/16/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/11/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* GEN SITE REVIEW- NO COMPLETE INSP TILL TOMORROW
03/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/05/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* PROGRESS WITH INTERIOR MASONRY WING B OK.2) POURING COLUMNS E-S OK
03/04/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/03/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
03/01/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/27/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/25/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/24/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/23/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/20/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/19/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/18/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/17/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1-E ELECTRIC PAD FOOTINGS AREA P/1 OK.
02/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/11/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/10/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-A RETAINING FOOTING EAST END OK TO PLACE CONCRETE. 2) P2-F BRIDGE FOOTINGS OK.
02/06/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/05/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/04/2004 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000*
02/03/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/02/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/30/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/29/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/28/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/27/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/26/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/23/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/22/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* GRADE BEAM @ STAIR 33 STEEL OK. PLEASE CHAIR FOR PROPER CLEARANCE TO FORMS
01/21/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* GRADE BEAMS @ STAIR 33 DENIED a) REF 121, 123 PROVIDE 1 1/2" CLEAR TO FORMS 3" CLEAR TO EARTS & HOOK BARS @ WALL SHOULD GO TO BACK OF WALL. b) MISSING VERTS.
01/20/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/16/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/15/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/13/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/12/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/09/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/08/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/07/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
01/06/2004 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/31/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/26/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/24/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/22/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/19/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-J WF2 FOOTING LINE 24 COMPLETE.
12/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2-I STAIR FOOTING #25 @ 24/HH PER REVISED. OK TO POUR.
12/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/04/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
12/01/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H COLS ( EXCEPT 2 DAMAGED BY EQUIPMENT) READY TO CLOSE & POUR
11/26/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/24/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* SOG COMPACTION P-1-H
11/21/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/20/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* ADDITION OF 2" WEEP HOLES @ SOUTH SIDE OF ENTRY BRIDGE REQUIRES INSTALLATION OF FRENCH GRAIN PER D.O.T.
STANDARDS, ISSUE WAS ADDRESSED WITH FRED PECH OF WEITZ.
PM- ENTRY BRIDGE HAS HAD FRENCH DRAIN OF <6" INSTALLED ALONG SOUTH SIDE TO HEIGHT OF 18-24" FROM BEDROCK SIDE TO TUNNEL. DRAIN FABRIC PLACED OVER TOP<3" TO BE USED OVER TOP OF BRIDGE
11/19/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H LINE 34/EE-GG CD FOOTIINGS OK. CC5 VERTS REQUIRE REPAIR @ EE.5
11/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* BLDG G 1) OK TO STAIR #16 TO LEVEL P-2 TO P-1. 2) OK 10 COLUMNS FROM Z LINE TO B,B.3
11/14/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* WEST 1/2 OF ENTRY BRIDGE OK TO POUR
11/13/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
11/07/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ P1-H F4-CCS @EE/34.5 AND F5-CCS @ FF.5/34.5.
11/06/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H DD/33 & EE/34 COL FOOTINGS PROGRESS OK. OK TO POUR WHEN SPEC INSP CONFIRMS FINAL ADJUSTMENTS OF VERTICALS.
11/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H COLS FOOTINGS EE/33 &34.
11/04/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* ENTRY BRIDGE TO USE 4K PSI CONCRETE. OK TO POUR.
11/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* BRIDGE @ ENTRANCE- LAP SPLICES DO NOT CONFORM TO 27" DEVELOPED LENGTH FOR 3000 PSI CONCRETE. PROVIDE RFI FROM ENG TO INCREASE CONCRETE STRENGHT TO 4K PSI OR REPAIR SHORT SPLICES.
10/31/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ COL FOOTINGS IN P1-H.
10/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/28/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2-C FOOTING FOR STAIR 3 REQUIRES 2' EXTENTION IN CENTER WALL. OK TO POUR WHEN SPECIAL INSP CONFIRMS.
10/27/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* BRIDGE FOOTING OK. PLEASE PROVIDE INFO ABOUT HOW WATER SEEPAGE SOUTH OF BRIDGE IS GOING TO BE HANDLED.
10/24/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2 & P1 H ISOLATED FOOTINGS OK WHEN VERTS COMPLETED
10/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H FINISH PLACING MATS & VERTS IN ISOLATED FOOTINGS.
10/22/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/20/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-E ADDED RETAIN WALL FOOTING LINE 7 OK
10/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/14/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H CC4-F7 FOOTINGS @28.4/CC.3 & DD.1 OK
10/13/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H F7,CC4 COLS @ 28/EE & 28.4/FF OK
10/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H F9-CCI FOOTINGS @ HH/32,33. 33 OK TO POUR. OK WHEN SPEC INSP CONFIRMS COMPLETION OF TOP OUT & VERTICALS.
10/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/07/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) I-A CAISSON @ F-11. 2) I-D 4 EACH CAISSONS LINE ZZ.4,ZZ.5
10/06/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-J 6 each col footings near 27.1/WW. 2) P2-G 3 EACH F4-CCI LINES BB.2 & BB.3
10/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
10/01/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P1-H F7 AND F5 FOOTING AT II 32.1-OK FOOTINGS: 1) P1-D RETAIN WALL FOOTING ZZ 6.5
09/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/1) P2-G FS AT BB/10 OK. 2) P2-H F7 AND F2 FOOTING II/32.1 REQUIRE CC1 AND CC4 VERTICALS FORMED BUT NO STEEL IN PLACE. 3) P1-J WFL UU-VV LINE 24.1 OK. /
09/26/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ P2-G FOUR EACH F2-CC5 FOOTING NORTH OF LINE 10 OK.
09/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* AM- P2-D RETAIN FOOTING ZZ.2/43 (CIP STAIR) OK
PM I-A CAISSON WITH CC1 LINE 11/C, D, E OK
09/22/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) 1-A CAISSONS 12/C, D, E OK & POURED. CAISSON 11/C, D, E OK TO POUR BELOW CCI COL. 2) P1-D RETAIN FOOTING NEAR 43/ZZ.2 DENIED a) USE STEEL CHAIRS FOR BOTTOM MATT DOBLES STACKED 5 HIGH ARE NOT SUITABLE. b) PROVIDE STEEL ON N-5 SECTION IS MISSING. c) CORNER BARS IMPROPERLY PLACED.
09/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/PLE CAISSON @ U/I OK.
09/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-H LINE 25.5/DD-EE.2 OK. 2) P2-G SPIRAL STAIR OK WHEN SPEC INSP CONFIRMS
09/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-H LINEE.1, LINE DD.1, LINE 24 OK. LINE 25.5 NEEDS TO BE CONTINUUOUS TO LINE DD.1
09/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-B LINE 13.5/G-J OK TO POUR. 2) P1-E CAISSONS LINE Q/2,3,4 OK TO POUR WHEN SPEC INSP CONFIRMS CCI VERTS.
09/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-B LINE 13.5/G-J #6 VERTS TO BE 10" O.C. TIE HORIZONTALS IN T&B PROPERTY.
09/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
09/04/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* LINE 27.1/EE.2 - FF.5
09/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-H RETAIN WALL FOOTING FROM CC.1/27.2 TO DD/25.5 OK 2) P1-H LINE 27.1/ EE.2- FF.5 a) THERE IS A NOTATION NEAR EE.5 CALLING FOR CC4 COLUMN- NO COLUMN IS MARKED PLEASE CONFIRM WITH ARCHITECT.
09/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
08/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
08/28/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P1-B A0 CAISSONS LINE 15.1 COMPLETE OK TO POUR. B) LINE 14.1/F.1 & G OK TO POUR
08/27/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
08/26/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-G FOOTINGS LINE Z & AA / 8,9,10. 2) P1-B CAISSONS LINE 14.1 STILL NEED VERTICALS FOR CCI COLS.
08/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* AM- P2-A CAISON @ 15.1/J READY FOR STEEL
08/22/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* PROGRESS
08/21/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
08/20/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) 15.1/D&E F4-CCI FOOTINGS OK. 15/D&E F6 FOOTINGS REQUIRE TOP MATS OF 8 #6 EASCH WAY.
PM- P2-G RETAIN WALL FOOTING FROM BB-CCI NEAR 7.1 OK
08/19/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-E LINE W/3,4,5, OK 2) P1-B CAISSON @ d/15.1 SURROUNDING ROCK IS CO;;APSING INTO CAISSON NEAR DEPTH OF 15'. HOW ARE YOU GOING TO FIND & FILL VOID? ( NOT VISIBLE DUE TO STEEL INSERT)
PM 1) P1-A CAISSONS LINE15.1/H-I OK LET SPEC INSP CONFIRM CCI VERTS BEFORE POURING. 2) J/15.1 CAISSON WAS SLURRY FILLED FOR CAVE IN REPAIR (19') WILL BE REDRILLED.
08/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P1-B CAISSONS LINE 15.1/F.1 AND G
08/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-G a) ELEC PIT @ X.5/9 OK b) Y/8 FOOTING OK. 2) P1-A CAISON @ D-15 REQUIRES MIN 3" CLEAR TO SIDES AND CCI VERTICALS.
08/14/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1)P1-J WF4 FOOTING TT-UU/24.1-26. 2)P2-J GRADE BEAMS NEAR LINE 35/00& KK A)KK-a) REMOVE BIG ROCKS FROM BOTTOM OF FORM. b) ONE OF THE EPOXIED #8 DOWELS FAILED INSPECTION.B) 00- SEE YESTERDAYS NOTES.
FINAL APPROVAL FOR POUR OF THESE 2 GRADE BEAMS MAY BE GIVEN BY SPEC INSPECTOR
08/13/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-D WF4 FOOTING #3 CLOSED TIES REQUIRED AT BRACED FRAME CONNECTIONS. OK TO POUR WHEN SPEC INSPTOR VERIFIES COMPLETION. 2) P2-J GRADE BEAMS LINE 35.1 a) NEAR KK REMOVE LARGE LOOSE ROCK IN BED b) NEAR OO NEED 2" CLEAR FROM STEEL TO FORM, NEED 3" CLEAR FROM STEEL TO BED, REMOVE BIG ROCK FROM BED AND SET COMPACTION TO 90%. #8 WALL DOWELS AT WEST END NEED TO BE BENT DOWN TO BOTTOM OF FORM FOR CONT. SPLICE. 3) P1-C COLUMN @ ZZ.2/41 - 30" LAP OUT OF FOOTING FOR #8 IS OK (4KSJ CONCRETE COMPRESSION ONLY)
08/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P1-D A) CAISSONS ZZ.2/41.5 AND 43-OK B) CAISSON ZZ.6/43-OK WHEN SPECIAL INSP VERIFIES CC1 VERTS 2) P2-6 A) ISOLATED FOOTINGS LINES W AND X-OK TO POUR B) FOOTING AT Z/10-OK TO POUR C) Z/8 DENIED FOOTING MUST BEAR ON UNDISTURBED OR COMPACTED SOIL, OR ON SLURRY FILL. PLEASE REMOVE RUBBLE
08/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* REVIEWED REPORTS FROM SPEC INSPECTOR (SCHNIEDER & ASSOC.) FOR 8/7 CONCERN WAS INSUFFICENT /OBSERVATION OF CONCRETE PLACEMENT. STILL NEED TO REVIEW TERRACON REPORTS FOR SAME DAY.
08/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-D a) SW 10 OK TO CLOSE. b) COLUMS @ 18/N,O & M.S / 15 OK. MAKE CORRECTIONS TO OTHER COLUMNS & WALLS AS NOTED ON TICKET ON STEAL
08/07/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*YOU REQUIRE SPECIAL INSPECTION DURING PLACEMENT OF ALL REINFORCED CONCRETE (GSN PP S1.01) THIS IS THE THIRD TIME I'VE BEEN HERE AND WITNESSED PLACEMENT WITH OUT INSPECTORS AROUND. I WANT SPECIAL INSPECTORS NOTES FOR TRUKS 205,216,219,220 & 226 eg. TIMES, LOADS, WHEN PLACED AND HOW.
P3-I F1 FOOTINGS WITH 16 + 16 COLS. WEST OF JJ BETWEEN 34.1 & 35 OK
08/06/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2-D ELEVATOR PIT FLOOR @ SW14 OK
08/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-H a) F3 @ II/29 OK. b) P1-D CAISSONS LINE ZZ.5/41-42; LINEZZ.6/41-42 OK TO POUR.
08/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PM. 1) P2-G BOTTOM OF ELEVATOR AND F4 FOOTING. BB-BB.1/SOUTH OF 9 AND NEAR BB.1/8 OK TO POUR
08/01/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-H LINE II.1/26-28 (SW30) OK TO POUR. 2) P2-G LINE BB.3/ 28-30 OK TO POUR . LINE 34 / BB.2-DD OK TO POUR
07/31/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
07/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P1-E, LINET/3,4,5 ISOLATED FOOTINGS OK. 2) P1-D 41,41 S 42/ZZ.3,ZZ.4, ZZ.5 ISOLATED FOOTINGS OK TO POUR WHEN SPECIAL INSPECTOR OBSERVES CCI VERTICALS PLACED.
07/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
07/28/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1)P2-I PP/29 OK TO POUR. 2)P1-J WF4 FROM II/24.1 TO UU/25.1 MAT STEEL OK, NEED ABS'.
07/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P3-J- RECIEVED RESPONCE FROM T-PAK ENG CONCERNING BENT A.B.'S THESE LIFTS ARE A PIN CONNECTIONS ONLY & THEREFORE STRAIGHTING OF BENT BOLTS IS OK. NO PULL TEST REQUIRED. 2) P2-I,J A) FOOTINGS @27.5/QQ.1,SS,TT,UU,VV OK TO POUR. B) FOOTING @ 29/00 OK TO POUR.
07/24/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-I, J A) LINE 27/NN, OO- OK B) LINE 27.5/NN, PP, QQ-OK C) LINE 27.5/WW, XX, YY-OK TO POUR 2) P1-E F7 FOOTING AT T/5-OK TO POUR, A) OTHER CAISSONS ON THIS LINE NOT READY A) STEEL TO 3" FROM EARTH B) LOOSE EARTH IN SIDES OF CAISSONS TO BE REMOVED 3) P2-G WF10 A AND WFB AT SW26 AND 27 ARE OK TO POUR FOLLOWING FINAL ADJUSTMENTS. A) TOP MAT AT SOUTH END OF WF10A REQUIRES 2" B) COMPLETE RELOCATION OF CC1 AT CC/30 TO CC/29.5 C) SW26 HAS BEEN LAID OUT FOR 16" THICK BUT JAMB DOWELS ARE AT 9" FOR 12" WALL. KEEP THIS IN MIND WHEN PLACING STEEL FOR WALLS
07/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) BLDG D,E A) CAISSONS BEING DRILLED B) BLDG D CAISSONS WRONG DIAMETER 2) P2-G A) WFB NOT PER PLAN-REQUIRES 2 #9 10" ON CENTER NOT ONE #9 B) WALL DOWELS NOT COMPLETE C) INSUFFICIENT FORM CLEARANCE
07/22/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I, J NEED ENGINEER REPORT FOR BENT AB'S 2) P2-I, J PROGRESS ON ISOLATED FOOTINGS
07/21/2003 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000*/ 1) P2, I, J LINE 29/LL, MM, NN-OK TO POUR 2) P3, I, J LINE 35.1 F1 FOOTINGS AT KK.5 AND 00.5-OK
07/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-J,J A) MM/27.1 OK TO POUR B) LINE 29 CAISSONS DRILLED-STEEL NOT IN PLACE 2) I NEED RFI FOR BOLTS THAT WERE BENT BACK UP, BUT NOT CUT AND WELDED
07/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-I,J: (A) LINE 27.11/PP OK TO POUR. (B) LINE 28/JJ,KK,LL,MM,NN,OO, - OK TO POUR. (C) LINE 25/JJ,KK,LL - OKTO POUR.
07/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-I,J LINE 25/NN,OO,PP FOOTINGS OK TO POUR 2) P2-I,J LINE 25/JJ,KK,LL-PLACE AB'S OK TO POUR WHEN SPECIAL INSPECTION CONFIRMS 3) PLEASE FIND A WAY TO PROTECT PL1 ANCHORS FRAM DAMAGE SIMILAR TO WHAT HAPPENED ON P3-J
07/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-I LINE 27 CASSENS AT JJ.1, KK AND LL OK TO POUR 2) P2-H LINE GG/24-26 AND LINE 24/GG-GG.1 OK TO POUR
07/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I,J ISOLATED FOOTING AT JJ/32.1-OK. THIS COMPLETES PC1 FOOTINGS IN THIS AREA. SEVERAL AB'S WILL REQUIRE REPAIR
07/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I,J ISOLATED FOOTINGS FOR P.C. COMPLETE EXCEPT FOR JJ/32.2
07/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* P2-B,3 ISOLATED CARSENS HAVE VERTICAL DOWELS PLACED AND CONCRETE IS BEING TAILGATED INTO FOOTING. 2) CONTINUE PROGRESS OR SPREAD FOOTINGS @ P3-IJ. 3) WF14 & WF15 FOOTINGS BEING POURED AREA G.
07/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* 1) P2-D??? PLACEMENT @ N/18, 0/8 ON 0/17 OK CCI COLUMN DOWELS STILL NEED TO BE PLACED BEFORE POURING 2) P2-G, A) LINE BB WF15 OK B) LINE 7.5 WF 14 OK C) LINE8.7 WF 14. PM INSPECTION OK TO POUR WHEN MINOR ADJUSTMENTS TO VERTS IN SW25 ARE MADE.
07/07/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I,J SPREAD FOOTINGS AT PP-32.1, PP 34.1 AND OO-43.1 OK; CONTINUED PROGRESS ON OTHERS
07/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I,J CONTINUED PROGRESS ON CAISSON FOOTINGS
07/01/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I,J PROGRESS ON CAISSONS, PLEASE PAINT BENT ANCHOR BOLTS FOR PRE CAST COLUMNS ORANGE 2) P2-G LINE 7.1/ZZ.5-AA.8 OK TO POUR
06/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-B, ELEVATOR P.T AT SW12 AND SW10 OK PER VERBAL WITH ENGINEER PF1/22 MAT STEEL IS #5 12" ON CENTER EACH WAY. AWAITING STAMPED RFI FOR MAT STEEL
06/27/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P3-I, CAISSONS LINE 34.1 AND LINE 30 AND 32.2/LL,MM CORRECTLY BEING PLACED. OK TO POUR WHEN PRECAST ANCHORS HAVE BEEN INSTALLED AND OBSERVED BY SPECIAL INSPECTOR
06/26/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P2-G, LINE 7.1/V-2
06/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) P1-A, LINE A.8/11-13 WF2 AND F4-CC2 OK TO POUR 2) P2-B, F9-CC1 AT N.5/11 AND M.5/15.15 OK TO POUR 3) F7-CC1 AT M/14.1 OK TO POUR
06/24/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
06/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) CASE STEEL AND DRILLED SHAFTS FOR F3 FOOTINGS AREA I LINE 34.1 OK. CASES AND ANCHORS FOR PC1 NOT YET PLACED
06/20/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - 1) AREA G SINED RFI DATED 6/18/03 RECEIVED FOR ? FOOTING U/8-10.5 OK TO POUR. 2) LEVEL P2 AREA H 31/GG-II NOT READY A) WP4 TO BE 16" WIDE SO STEEL SHOULD BE 13"WIDE B) VERTICALS FOR SW28 NOT PLACED
06/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) LEVEL P1 WF8 AT LINE XX/LINE 24' A) MAT STELL IN COMPLIANCE B) #9 VERTICALS FOR CMU PILASTERS REQUIRE 62 BAR DIAMETER (69 DEGREE) ABOVE FOOTINGS FOR LAP SPLICE. BARS ARE ONLY 53" A.F. C) I NEED TO SEE RFI FROM ENGINEER FOR CONDUIT FOOTING-I ALSO NEED TO SEE COMPLETED CONDUIT. 2) LEVEL P2 AREA H LINE GG/26-30 OK TO POUR A) CORNER C AND FOOTING ON LINE 31 NOT READY 3) LEVEL P2, AREA G, WF8 AND WF13 ON LINE U/8-10.5 A) STEEL IS IN COMPLIANCE WITH VERBAL OK FROM ENGINEER FOR SW22 AND TRANSVERSE NOT REPAIRED. I NEED TO SEE STAMPED RFI
06/17/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) PLEASE DISREGARD APPROVALS TO POUR THAT WERE GIVEN YESTERDAY BY ALTERNATE CITY OF TUCSON INSPECTOR 1) BLDG J, XX LINE FROM 24-25.5 IS NOT READY. I WILL NEED ENGINEERING APPROVAL FOR EXCESSIVE ELECTRICAL CONDUIT IN FOOTING. NO VERTICALS FOR MASONRY WALLS ON PILASTERS HAVE BEEN PLACED B) BLDG J LINE FROM 8-10. WFB REQUIRES 2 #9 BARS 10" ON CENTER TOP AND BOTTOM YOU ARE MISSING 50 PERCENT OT THE BARS. AN RFI FOR CHANGE TO SW22 IS REQUIRED AS IT DOES NOT CONFORM TO PLAN NOT TO DETAIL F/3.03. WF8 REQUIRES 20 EACH #9 BARS TOP AND BOTTOM YOU ARE MISSING 2 BARS. SW21 HAS NOT BEEN LAYED OUT ACCORDING TO F/3.03 2) WF8 LEVEL P2 LINE ZZ/27.3-28/OK 3) LEVEL P1, AREA D, LINE R/2.2-6.5/OK
06/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) BLDG J XX LINE FROM 24 TO 25.5 2) BLDG G V LINE FROM GRID 8 T0 10 3) BLDG E R LINE FROM 2.5 TO D STRP FTG. 4) OK TO POUR
06/13/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
06/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) F5 COLUMN FOOTINGS LEVEL P2 AREA B OK
06/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) LEVEL P2 AREA D AND E LINE R STEP FOOTING TO P1 OK 2) LEVEL P2 AREA C AND D STEP FOOTING ZZ.2-ZZ.3 PREVIOUSLY APPROVED
06/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) CLARIFICATION AT KEYNOTE 4 FOR FOUNDATIONS AT SW18 AND SW19 RECIEVED. STELL PLACED ACCORDINGLY AND CONCRETE PLACED 2) LEVEL P1, AREA D AND E LINE 40/ZZ.65-ZZ.79 OK TO POUR 3) LEVEL PC, AREA J COL FOOTINGS A) LINE 29/TT, UU, VV, WW, XX B) LINE 31.1/TT C) LINE 32.2/QQ, QQ.1, 55, TT, UU, VV, WW OK TO POUR
06/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) WF8 AT XX/27.3-27.1 OK NOTE: LAP LENGTH FOR STEEL IN MASONRY PILASTER OK PER UBC. PILASTERS CHANGED FROM WP1 TO WP2 TYPE PER RFI 100 2) LEVEL P3 AREA J-COL FOOTINGS LINE 31.1/UU, UU1, WW, XX, YY AND YY/29.1 OK TO POUR 3) LEVEL P2 AREA B COLUMN FOOTINGS OK ON LINES 17 AND 18 4) LEVEL P1, AREA D/E; 0.5-2.5/Q-U.5 OK TO POUR
06/06/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) LINE 35-LEVEL P3 LL-QQ DOWELS PLACED-OK TO POUR 2) AREA J, P3 INTERIOR FOOTINGS HAVE COREECT STEEL AND CAISSON DIAMETERS. CAISSON CAGES AND SOME MAT STEEL STILL NEEDS TO BE PLACED A11 PC1 AB'S STILL NEED TO BE PLACED 3) AREA E, FOOTING AT T-2 NOT READY A) I NEED RFI FOR CLARIFICATION OF KEYNOT 4 RE: BUNDLED TRANSVERSE BARS AND UNDER WHICH WALLS B) YOU STILL NEED TO PLACE WF3 DOWELS C) F7-CC1 STEEL MISSING AT 1/2 5) AREA B, LEVEL P2 CAISSONS IN AREA F-L REQUIRE SIDE CLEARANCE ADJUSTMENTS AND PLACEMENT OF VERTS FOR CC COLUMNS
06/05/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) AREA J LEVEL P3 LINE 35/ LL-PP 1) NEED TO EPOXY FOOTING DOWELS AT LL OK TO POUR WHEN SPECIAL INSPECTOR OBSERVES EPOXY PLACEMENT
06/04/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) AREA B LEVEL P2, STEP FOOTING LINE 14/J.S.L. INCORRECT STAGGERING AT LAP SPLICES. CONTRACTOR REPAIRING AT THIS TIME-FOOTING MAY BE POURED WHEN SPECIAL INSPECTOR OBSERVES COMPLETION 2) CC1-F4 AT L/19OK TO POUR BOTTOM 40' 3) ARENA, LEVEL P1, A.8-C.2/11.8-16.5 OK TO POUR
06/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) F6 FOOTINGS LINE 12 AT B & C REQUIRE 1" MINIMUM CLEAR DISTANCE BETWEEN #6 AND #10 MAT BARS
06/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) AREA "B" LEVEL P2, REMAINING F4-CC1 LINE 21 AND F2-CC2 LINE 22 OK 2) RETAINING FOOTING FROM M-14 ALONG LINE 40 TO 22.6 F5 (4/5) FOOTINGS ALSO PLACED 3) PM-DO FURTHER WORK READY FOR INSPECTION
05/30/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) LEVEL P1, A.S5-C.5/12-16.2 OK 2) PLEASE INSTALL F6/CC1 MATS AND VENTS AT SW1 AND SW2 OK PER RFI 102 2) PLEASE INSTALL F6/CC1 MATS AND VERTS AT C12 AND B13 3) LEVEL P2. LINE 19/M-P F4 AND F2 FOOTINGS (CA155045) ONLY BOTTOM 1/2 OF CAISSON AT M19 TO BE POURED
05/29/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) WF8 ON LINE XX. LEVEL P2-P1 HAS COMPLETE MAT BUT IS LACKING VERTS FOR WALL PILASTERS AND RETAINING WALL 2) RETAIN FOOTING LINE 24.1/QQ-RR OK (LEVEL P2-P1) 3) DO NOT POUR FOOTING AT 14/B LEVEL P1 UNTIL VERTICAL STEEL IN SW1 AND SW2 HAS BEEN PROPERLY PLACED AND INSPECTED
05/28/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*/ 1) WF8 ON LINE XX. LEVEL P2-P1 HAS COMPLETE MAT BUT IS LACKING VERTS FOR WALL PILASTERS AND RETAINING WALL 2) RETAIN FOOTING LINE 24.1/QQ-RR OK (LEVEL P2-P1)
05/27/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1) LEVEL P2-LINE 24.1/QQ-SS TOP MAT TRANSVERSE BARS TO BE NO MORE THAN 12" ON CENTER 2) LEVEL P1-SW1 AND SW2 (AREA A) STILL DO NOT HAVE VERTICALS COMING OUT OF MAT PLACED CORRECTLY. RE: DETAIL F PP53.03
05/23/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
05/21/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*VERTICALS FOR SW 1 & SW3 LEVEL P1, B-C/B-15.1
MUST BE PER DETAIL PP 3.03. 7" CENTERS NEED TO BE MAINTAINED FOR PROPER CLEARANCE @ SPLICES.
2.) RETAIN WALL FOOTING, LEVEL P2 FROM 14 N THRU 16.5 P.
05/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*SHEAR WALL 6 MUST HAVE 1 1/2 SIDE CLEARANCE DO NOT DOUBLE UP UNTIL APPROVED.
2.) FOOTING WF2, GRID 14, L-M 5, OK TO POUR 5.2.01.
3.) RET WALL CORRECT REBAR SPACING @ CONTROL JOINT, INSTALL EMBEDS, CONTINUE STEEL TO TOP OF POUR LINE. OK TO DOUBLE UP PENDING SPECIAL INSP. OK.
05/14/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*LEVEL P3, II.2/33.1 THRU JJ 33.5 DONE YESTERDAY BUT NOT NOTED. LEVEL P2, LINE 16.5 J-L. LEVEL P2, WING B F10 FOOTING @ 17/M.5.
05/13/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) WING B LEVEL P2, LINE 16.5/F-G & LINE F 13.5-17.5 (WF11)
2.) WING I LEVEL P3, LINE JJ/33.1-35.5 LINE 35/JJ-LL.
05/12/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*AREA LEVEL P2 LINE 16.2/G-J OK.
05/09/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*LEVEL P2 AREA D P.5 U.1/6.5-8.1.
05/08/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PROGRESS OBSERVATION @ ELEVATOR SHAFT HOTEL SIDE.
05/07/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*LEVEL P2 LINE 24.1/HH.1-KK 85% COMPLETE OK TO POUR FOOTING WHEN SPECIAL INSP. CONFIRMS COMPLETION.
05/06/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) CONCRETE PLACED LEVEL P3, LINE II.2 UPPER SECTION AT WF10. SIDE CLEARANCES CORRECTED BEFORE POUR.
2.) MISPLACED BARS DRILLED/DOWELED TO FOOTINGS REQUIRE EPOXY.
05/02/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*LEVEL P3 WF10 FOOTING 30-34.1 LINE II.1 OK TOP OUR 3 #9 VERTS EACH FACE REQ @ II.2/30.5.
2.) LEVEL P2 WF2 KK-QQ LINE 24.1 OK TO POUR YOU MAY POUR JJ-KK LINE 24.1 IF SPEC. INSP OBSERVES COMPLETE.
05/01/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) LEVEL P2;WE2 QQ-TT ON 27.3; WF6 24.5 -27.3 ON QQ.
2.) AREA B FOOTING UNDER SW90,11,12,5.6. (15.1 -16.2) M.J.S.)
04/25/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*WF2 FOOTING FROM JJ 3.1 EAST TO LL29.1 OK PER SPEC. INSP. REPORT.
04/21/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*SITE VISIT MADE FOR GENERAL OBSERVATION OF CONSTRUCTION.
04/18/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*RETAIN WALL LINE 28.2 @ QQ.1 UU.1 POURED.
2.) RETAIN WALL LINE 29.2 NN - PP.
NEARLY COMPLETE. MAY BE POURED WHEN SPECIAL INSP. OBSERVES FINAL FORM PLACEMENT.
3.) FOOTINGS LEVEL P2, LINE 27.3 XX3 YY.1 AND TT WW.1 OK TO POUR.
04/16/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) WF2 @ P1-QQ LINE 35.
2.) RETAIN WALL LEVEL #3 @ WW.2 LINE 28.2
04/15/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*WF8 &WFR @ 21-22/L-N
2.) WFR YY 33.1 TO ZZ 32.1
3.) RETAIN WALL LINE 28.5 UU.1 TO WW.S
04/11/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) YY-ZZ/32.2 -33.1
2.) RETAINING WALL YY.1 WW.2 ON LINE 29.2 PER RFI #9 & #23.
04/10/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*WF8 @ LINE QQ 33.1-35.
04/03/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) AB'S @ PRECAST 21" X 1 1/4" W 15" EMBED REQUIRED
2.) WFS @ QQ LINE 29.
3.) WF2 @ LINE 29.2/LL-QQ
4.) WF2 & F3 FOOTINGS LINE 39.1/QQ1-XX.5
03/28/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*CANTILEVER WALL DESIGN CHANGE DATE 1-03 USED FOR REFERENCE.
2.) WF2 LINE 28.5 QQ THRU 22.
3.) WF9 LINE YY.1 2 THRU 31.5.
03/27/2003 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*MET WITH FRED PECH OF THE WEITZ CO. TO GO OVER CITY REQUIREMENT AND SOME PRELIMINARY INFORMATION.
2.) CONSTRUCTION TRAILER IS BY 10TH TEE MAINT. YARD.