Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2004 |
PLUMBING - PROGRESS |
|
Approved |
IVRS - Inspection :* |
| 05/17/2004 |
PLUMBING - PROGRESS |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) HAVE ROOF DRAIN ADDED TO YOUR PERMIT WITH CITY APPROVED DRAWINGS FOR ACTUAL ROUTING. 2) RAIN DRAIN AND OVERFLOW RAIN DRAIN TO BE CAST IRON PER PLAN. 3) SECURE DRAIN ON NORTH WEST CORNER. 5) ALL OVERHEAD PIPING TO BE SUPPORTED AT CORRECT INTERVALS WITH APPROVED HANGING MATERIALS. HOSE BIBS ON NORHT WEST, SOUTH WEST, SOUTH EAST 60 PSI AIR TEST OK. A) NORTHEAST HOSE BIB TO HAVE MIN 60 PSI TEST WITH BRASS NIPPLE FOR CONNECTION TO HOSE BIB. B) ALL H2O PIPING TO BE 100 PSI TEST PER PLAN. |