Inspection History Details
Inspection Status: Closed
Inspection History: ELECTRIC - FINAL
Permit Number - T02CM05243
Inspection Description - ELECTRIC - FINAL
Inspection Status - Closed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2008 | ELECTRIC - FINAL | Closed | ref t04el01747 | |
| 01/28/2003 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 1.) THE PERMIT FOR ABOVE WORK HAS NOT BEEN FINALED. THIS PERMIT NEEDS TO BE APPROVED IN ORDER FOR GAS DISPENSERS TO HAVE BEEN OPERATIONAL A FIRE INSPECTOR ALSO HAS TO GIVE A FINAL ON THIS PERMIT. 2.) ELECTRICAL CONTRACTOR OF RECORD HAS TO PROVIDE DOCUMENTATION OF COMPLIANCE WITH 1999 NATIONAL ELECTRICAL CODE SECTIONS 514-5 AND 514-6. PLEASE CONTACT CONTRACTOR (ELECTRICAL) TO SET UP MEETING WITH INSPECTOR TO VERIFY FINAL INSPECTION. THIS MUST BE DONE ON A MOST URGENT BASIS. |
|
| 12/16/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* Finish #1 of previous inspection also please incorperate permanent label at all locations of disconnecting means. |
|
| 12/10/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* OK TO POUR CHICO. 1.) PLEASE PROVIDE VERIFICATION OF 514-6. 2.) PLEASE RECALL FOR CHICO INSPECTION. 3.) SUPPORT FLEX CONDUITS IN CABINETS. |