Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/13/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NEED SAME VERTICAL ST FOR CONCENTRATED LOADS GLU LAMS FROM ROOF TO FLOOR 2) ADD 2 X 6 STRONG BACK IN FLOOR JOISTS PER TRUSS CALC'S 3) ADD 2 16D'S AT TOP BOTTOM PLATES WIND BRACES 4) PLYWOOD BAND FOR LATERAL AT FLAT FLOOR TRUSSES 1ST TO 2ND FLOOR EAST WEST |
| 12/13/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000*/ 1) G ON CENTER NAILING OSB BAND FLOOR=TO=FLOOR 2) VERTICAL AT INTERMEDIATE GLU LAM BRING SAME # OF STUDS DOWN TO AND IN BETWEEN FLOOR JOISTS, WILL CHECK AT INTERMEDIATES |