Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*CORRECTIONS HAVE BEEN MADE AP. FINAL OK REVISED PLAN ON JOB FOR LOCATION OF WATER HEATER. LADDER HAS BEEN INSTALLED. |
|
| 02/14/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* PLEASE PROVIDE APPROVED REVISED PLAN ON LOCATION OF WATER HEATER WATER HEATER WILL REQUIRE ACCESS. SEE 94 UPC 511.2 94 UPC VACUUM BREAKERS REQUIRED AT HOSE BIBBS. |