Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2002 | ELECTRIC - CABLE DROP | Approved | ||
| 12/03/2002 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection 0999* | |
| 11/27/2002 | ELECTRIC - CABLE DROP | Not ready for Inspection | IVRS - Inspection 0000* NEED INSTALL HOT INSTALLED CANNOT EXCEDE 6FT LENGHT MAINT RECEPT REQUIRED FOR HUAC AREA. |
|
| 11/21/2002 | ELECTRIC - CABLE DROP | Not ready for Inspection | GROUND RODS APPROVED. 1.) PERMANENT ADDRESS LABEL REQUIRED 2.) A GROUNDING BUSHING AND BOND JUMPER REQUIRED AT NIPPLE IN METER BASE. 3.) WILL NEED A WATER BOND. 4.) STEEL BOND PLEASE USE MEET AND BOLT CONNECTION 5.) SLEEVE FOR MAIN GROUNDING ELECTRODE CONDUCTOR TO BE BONDED TO GROUNDING ELECTRODE AT CONDUIT END. 6.) NEW SERVICE IN VIOLATION OF CITY ORDINANCE NO. 9287 IE THE UNIFORM ADMINSTRATIVE CODE SECTION 108, PROHIBITING OVERHEAD DROP SERVICES. |