Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2003 | ENGINEERING - FINAL | Approved | ||
| 04/21/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PERMANENT C OF O NOT TO BE GIVEN UNTIL: 1. THE FINAL GRADING INSPECTION #09190 FOR T01BU02613 IS COMPLETED AND APPROVED. 2. ROOF DRAINAGE FLOW IS DIRECTED UNDER THE SIDEWALK. |
|
| 04/18/2003 | ENGINEERING - FINAL | Denied | COMPLETE ALL WORK ADJACENT TO THE SIDEWALKS/PEDESTRIAN ACCESS AREAS PRIOR TO RESCHEDULING THIS INSPECTION. |