Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 02/28/2003 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000* |
| 02/25/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) FIRE PALCE NOT INSTALLED 2) EXPOSE ALL NEW PLUMBING UNDER SLAB IN LAUNDRY ROOM, HALL BATH AND PROVIDE NEW DWV TEST 3) STUCCO MESH NOT COMPLETED |
| 02/24/2003 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) FROM LAST INSPECTION INSTALL ALL A.B.'S AT PLATE JOINTS AND SHEARWALL HILTI PINS GOOD UP TO #3 SHEAR ONLY 2) PLUMBING UNDERGROUND TO BE REINSPECTED 3) MOVE PEX AT CAN LIGHTS FRONT BATH AND KITCHEN, MINIMUM 12" AWAY |
| 02/21/2003 |
FRAMING |
|
Partial Approval |
1) MOVE PEX AWAY FROM LIGHT CANS (2) INSTALL TUB 2) ANCHOR BOLTS AT BOTTOM PLATES 3) NEED FIREPLACE INSTALLED 4) PLUMBING FOR TUB BELOW SLAB TO BE INSPECTED GAS/DWV OK 5) SHIM UNDER DIAGONAL WALL 3 PT BEARING |
| 02/19/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) 1040 STUCCO MESH MUST BE COMPLETED BEFORE INTERMEDIATES ARE INSPECTED |