Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/25/2002 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 10/24/2002 |
PLUMBING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) FOR COMPLETE FINAL BOND HEATER CABINET AND SUPPORT & LIFT LIQUID TITE FLEX OFF THE GROUND 2) INSTALLATION INSTRUCTIONS REQUIRED 4' HORIZONTAL MINIMUM DISTANCE FROM HEATER TO WINDOW 3) LEFT GAS TAG 4) INSTALL NIPPLE WITH GAS VALVE CAP OFF NIPPLE FOR GAS CAP OFF HEATER TO BE MOVED IF ADDITIONAL GAS PIPE INSTALLED NEED RETESTING |